Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF JULY 16, 2005 FBO #1328
MODIFICATION

Z -- Installation of new domestic water lines for government quarters

Notice Date
7/14/2005
 
Notice Type
Modification
 
NAICS
238220 — Plumbing, Heating, and Air-Conditioning Contractors
 
Contracting Office
ACA, Fort Riley, Directorate of Contracting, 802 Marshall Loop, Fort Riley, KS 66442-0248
 
ZIP Code
66442-0248
 
Solicitation Number
W911RX-05-B-0010
 
Response Due
7/27/2005
 
Archive Date
9/25/2005
 
Small Business Set-Aside
N/A
 
Description
Furnish all plant, labor, equipment, materials, and transportation performing all required work in accordance with the plans and specifications for the installation of new domestic water lines for government quarters. This includes the replacement of the incoming water line from the street if it had not been yet completed. Sites for the required work are located in Housing Areas 19, 20, 21, 22, 23, and 24 of Fort Riley. There are approximately 371 Split Style Government Quarters and 336 Flat Style Gov ernment Quarters that need water line replacement. Contractor shall install 6-mil transparent sheet polyethylene plastic on the ground, walls, and columns in the crawl space in each dwelling unit. Plastic shall be at least 12 inches on the walls and column s from the ground. This phase of the work must be completed first. Perform air-monitoring tests in each crawl space. Test multiple samples for asbestos containing materials. Provide test reports to the DPW Environmental Division, contracting office, and t he Fort Riley Housing Department. Encapsulate all existing pipe joints within each crawl space. Glove bag asbestos containing material in split style government quarters at the joints for the risers that serve the second floor bathroom. Existing risers for the bathtub, sink, and toilet on the second floor shall remain in split style government quarters. Remove pipe as necessary to install new service to fixtures (i.e. sinks, toilets, dishwasher, washing machine, bathtub). Existing pipe shall be abandoned in place as much as possible. Install new hot and cold water domestic pipes for each type of dwelling unit: flat or split style. New hose bibs shall be installed with isolation ball valves. Shut off valves for various fixtures (i.e. sinks, toilets, and batht ubs) shall be installed in the floor. New valves for the washing machine shall be installed within the drywall. Install new water pipe for the incoming water service from the street if it has not been completed. Ball valves shall be easily accessible in th e utility closet to shut off water to the dwelling unit. Ball valves shall isolate the existing hot water heater. The magnitude of this construction project is between the estimated price range of $1,000,000 USD and $5,000,000 USD.
 
Place of Performance
Address: ACA, Fort Riley Directorate of Contracting, 802 Marshall Loop Fort Riley KS
Zip Code: 66442-0248
Country: US
 
Record
SN00847396-W 20050716/050714212346 (fbodaily.com)
 
Source
FedBizOpps.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.