MODIFICATION
Y--Y -- Data Center
- Notice Date
- 7/21/2005
- Notice Type
- Modification
- Contracting Office
- Attn: Department of Veterans Affairs Pittsburgh Healthcare System, Contracting Officer, (04A-H), 7180 Highland Drive, Pittsburgh, Pennsylvania 15206
- ZIP Code
- 15206
- Solicitation Number
- 244-05-00906
- Response Due
- 7/27/2005
- Archive Date
- 8/26/2005
- Small Business Set-Aside
- N/A
- Description
- Pre-bid minutes: PRE-BID MEETING MEMORANDUM VAPHS - HJ HEINZ DATA CENTER BUILDING 32 IKM PROJECT NO. 04-039 VAPHS Project No. 646-363 IKM Project No. 04-039 Meeting Date: July 14, 2005 Location: Heinz Director's Conference Room VAPHCS-H.J. Heinz Division Present: Lynne Dickerhoff VAPHS Contracting Officer Jeff Heiger VAPHS Tom Brletic A.G. Cullen Construction Dan Bradley Sauer Inc. David Kmink James Construction David Turner Graybar Fred Fons Tyco Electronics Frank Harvey Rycon Construction Jack Opel Reginella Construction Bill Pizoli TRI Inc. John Gallo Sr. Dick Corporation John Carlo Gallo Dick Corporation Bill Mackowick TJR Enterprises Inc. Eric Pascucci P.J. Dick Inc. Jim Dunlay Storkey Access Technology Dan Marotte Lytle Construction Services, Inc. David Ruppe Engineering Products Services Will Galia Engineering Products Services Mark Ellis FMRW Rich Pecora FMRW George Bedo IKM Mr. Heiger, after a few opening comments, introduced the design team and Lynne Dickerhoff to the assembled for this Pre-bid Meeting. 1. Lynne Dickerhoff commented on the clarifications previously posted on the web site for the bidding of the project, such as the cost of the Construction Documents, $175 per set, access to the bidding information and the Documents on the Web, date of the Pre-Bid Meeting and the clarification of the alternate bids. She also distributed to all in attendance the results of ATS Geotechnical Investigation Report for informational purposes only. The information is not part of the Construction Document, therefore bidders must verify all information contained in this report. 2. Mr. Heiger asked all in attendance if they had any questions regarding the Alternate Bid Deducts #1, # 2 and # 3. There were no questions. 3. Mr. Heiger also commented on the required documentation by the successful bidder of OSHA training of the staff. 4. Opening of the bids will be at 2:00 PM, July 27, 2005. He requested that the bid prices shall be held for 90 days; Contracts will be signed no later then early October with construction starting immediately. 5. Lynne Dickerhoff will receive questions until July 22, 2005. 6. Parking and staging will be restricted to the construction site. 7. There was an orientation tour of the site; during the tour Mr. Heiger gave a general idea of location of the site and the connection to the existing building. The tour included a walk through of the First Floor of Building 32. He made references to clean-up and abatement issues contained in the General Conditions of the Specifications. Submitted by, IKM INCORPORATED George A. Bedo, AIA BID OPENING: July 27, 2005 at 2:00PM at the VA Pittsburgh Healthcare System, 7180 Highland Drive, Bldg. 4, 3rd floor, Room # 373E.
- Place of Performance
- Address: VA Pittsburgh Healthcare System, H. John Heinz III, Progressive Care Center, Delafield Road, Pittsburgh, PA 15215
- Zip Code: 15215
- Country: United States
- Zip Code: 15215
- Record
- SN00851847-W 20050723/050721211944 (fbodaily.com)
- Source
-
FedBizOpps.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |