Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF AUGUST 17, 2005 FBO #1360
MODIFICATION

Z -- Replace Primary Pumping Station Valves

Notice Date
8/15/2005
 
Notice Type
Modification
 
NAICS
237110 — Water and Sewer Line and Related Structures Construction
 
Contracting Office
100 Kindel Drive Suite A332 Arnold AFB, TN, 37389
 
ZIP Code
37389
 
Solicitation Number
FA910105R0044
 
Response Due
9/15/2005
 
Archive Date
10/30/2005
 
Small Business Set-Aside
N/A
 
Description
This project consists of providing all materials, equipment and labor required for the installation of a stand alone fire pumping station and replacement of water piping and valves located at the Facility 3038, Primary Pumping Station, Arnold AFB, Tennessee as described below. The work consists of all required equipment and materials to completely install a new fire pumping system as shown on the drawings. The fire pumping station shall consist of all pumps, piping, and controls. The fire pumping station shall be completely installed and tested before any of the remaining work is begun. The work also consists of the demolition of a 36-inch diameter coupling, a 36- to 24-inch diameter reducer, a 24-inch diameter gate valve, a 24-inch diameter cone valve, connecting hydraulic piping, connecting electrical supply and connecting control systems for each of six pumping systems. The work consists of providing a 36- to 24-inch diameter reducer, two 24-inch diameter butterfly valves, a 24- inch diameter coupling, a 24-inch diameter cone valve, connecting hydraulic piping with valves, connecting electrical supply and connecting control systems for each of six pumping systems. The new cone valves are expected weigh approximately 8000 pounds each. The valves and piping are located in a confined space in the basement that is only accessible through a hatch cover above each cone valve. The cone valve concrete footings shall be modified or replaced as required to maintain structural integrity and to fit modified footprints. Piping shall be carbon steel and shall require ASME B31.3 and ASME B+PVC Sec IX execution. Work is to be done at Arnold Air Force Base, Tennessee. For more information on FA910105R0044--Replace Primary Pumping Station Valves please refer to http://www.pixs.wpafb.af.mil/pixslibr/FA910105R0044/FA910105R0044.asp
 
Web Link
FA910105R0044-Replace Primary Pumping Station Valves
(http://www.pixs.wpafb.af.mil/pixslibr/FA910105R0044/FA910105R0044.asp)
 
Record
SN00870477-W 20050817/050815211859 (fbodaily.com)
 
Source
FedBizOpps.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.