Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF AUGUST 31, 2005 FBO #1374
SPECIAL NOTICE

99 -- Inclusion of Kaba Ilco Card Key Access System for Phases 2E, 2F and 2G, Whole Barracks Renewal, Schofield Barracks, Oahu, Hawaii

Notice Date
8/29/2005
 
Notice Type
Special Notice
 
NAICS
444130 — Hardware Stores
 
Contracting Office
US Army Corps Of Engineers, Honolulu, Building 230, Fort Shafter, HI 96858-5440
 
ZIP Code
96858-5440
 
Solicitation Number
USA-SNOTE-050829-003
 
Archive Date
10/28/2005
 
Description
The Government intends to include Kaba-Ilco card key access system into the solicitation for Project Number 48785, Whole Barracks Renewal, Phase 2E; Project Number 57035, Whole Barracks Renewal, Phase 2F and Project Number 58294, Whole Barracks Renew al, Phase 2G, Schofield Barracks, Oahu, Hawaii. This electronic card key access system has the following salient performance features and characteristics - expandable, electronics and batteries are located in the inside housing protecting them from the ele ments and vandalism, hidden mechanical override and removable core, visual and audible operation indicators, operates on standard batteries, event audit trail tracking, real time system, resists forcible entry even though outside lever is twisted off, meet s American National Standards Institute (ANSI) and Builders Hardware Manufacturers Association (BHMA) grade 1 requirements for lever torque test, and has a durable and scratch resistant finish fully guaranteed for two years. Phases 2E, 2F and 2G are compo sed of sixteen new buildings (two barracks, nine company operations facilities, four battalion headquarters and a brigade headquarters, along with required supporting facilities. In accordance with a directive approved by the Assistant Chief of Staff for I nstallation Management, the Director, Installation Management Agency and the Director for Military Programs on 14 December 2004 and recommendations contained in US Army Corps of Engineers Engineering and Construction Bulletin, No. 2005-1, 18 March 2005, th e Directorate of Public Works (DPW) has implemented a plan to ensure consistency, compatibility, and sustainability for electronic card key access systems for USAG-HI installations. Facilities impacted include all new buildings, barracks as well as adminis trative facilities. This would avoid a proliferation of different brands of card key access systems, minimize/consolidate spare parts and stock, and establish a team of well trained maintenance experts. To sustain these objectives, all new building constru ction should provide Kalba Ilco brand electronic card key system to: (1) Ensure consistency within the Quads I, J and K area (Phase 2, WBR); (2) Ensure compatibility with the systems installed in Phases 2A, 2C and 2D; (3) Ensure maintainability and service ability expertise by DPW staff; and (4) Proven durability and performance of systems installed to date. Utilization of another card key access system would result in a substantial duplication of cost to the Government that is not expected to be recovered t hrough competition. Any interested contractors shall respond by October 13, 2005.
 
Web Link
Honolulu Engineer District Contracting Home Page
(https://www.poh.usace.army.mil/pohct/contracting.asp)
 
Record
SN00881945-W 20050831/050829212313 (fbodaily.com)
 
Source
FedBizOpps.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.