SOLICITATION NOTICE
C -- REGIONAL A-E IDIQ WATERFRONT FACILITIES, VARIOUS LOCATIONS IN CA, AZ, NV, NM, OR, ID, AK, WA, MT, AND UT. PREPONDERANCE OF WORK IN SOUTHERN CALIFORNIA
- Notice Date
- 8/30/2005
- Notice Type
- Solicitation Notice
- NAICS
- 541330
— Engineering Services
- Contracting Office
- Department of the Navy, Naval Facilities Engineering Command, NFEC Southwest, Capital Improvement Contract Core, Attn: Code RAQ20 1220 Pacific Highway, San Diego, CA, 92132-5190
- ZIP Code
- 92132-5190
- Solicitation Number
- N68711-05-R-4081
- Response Due
- 9/29/2005
- Archive Date
- 10/14/2005
- Description
- DESCRIPTION: Firm-Fixed Price/Indefinite Quantity Contract for furnishing of waterfront engineering services including design (for construction and repair), RFP preparation for design-build projects, inspections, hydrographic surveys, planning documents? preparation (Form DD1391), construction support, cost estimates, and related studies for projects involving waterfront facilities, including piers, wharves, quaywalls, marinas, fendering systems, mooring systems, shore protection systems and dredging at various locations in the FEC Southwest area of responsibility consisting of California, Arizona, Nevada, New Mexico, Oregon, Idaho, Alaska, Washington, Montana and Utah. The preponderance of the work will be in Southern California. The A-E firm shall have the ability to perform the engineering services, including underwater inspections, on an accelerated schedule and be available on an emergency basis. The maximum contract value may not exceed $5,000,000 aggregate total. No single delivery order may exceed $500,000. The Government has the option to extend the contract for two additional periods with a maximum contract limit of not to exceed $1,500,000 each period, and not to exceed $500,000 for a single delivery order. Each performance period will run 365 calendar days, or until the maximum dollar limit is reached, whichever occurs first. The total amount of the contract (base period + option period #1 + option period #2) shall not exceed $5,000,000. The minimum delivery order amount will be $5,000. Multiple task orders may be awarded with similar completion schedules and overlapping delivery dates. The hourly rates will be negotiated for each calendar (12 month period) year and are independent of which option year is in effect. The government may exercise the option period unilaterally. Per NFAS 17.208-100(c)(1), options for post construction award services may be negotiated on individual task orders for unilateral exercise. Estimated start date for this contract is February 2006. Federal Acquisition Regulations (FAR) Part 36.6 (Brooks Act) selection procedures apply. This is an unrestricted procurement. The NAICS Code for this procurement is 541330 and the annual small business size standard is $4M. The Government makes no representation as to the number of task orders or the actual amount of work to be ordered. Contractors are not guaranteed work in excess of the minimum guarantee. Firms that design or prepare specifications for a construction contract or task order issued under the resulting contract are prohibited from providing the subsequent construction. This limitation also applies to subsidiaries/affiliates of the firm. SELECTION CRITERIA AND SUBMITTAL REQUIREMENTS: The selection will be based on the following criteria and are in descending order of importance: Criteria 1, Professional Qualifications (SF 330, Section E); Criteria 2, Recent Experience (SF 330, Section F); Criteria 3; Past Performance (SF 330, Sections F & H); The remaining Criteria is to be addressed in SF 330, Section H. Criteria 4; Quality Control; Criteria 5, Capacity; Criteria 6, Sustainable Design and Anti-Terrorism Force Protection; Criteria 7, Location; Criteria 8, Commitment to Small Business Concerns (Large Firms Only); and Criteria 9, Volume of Work. SF 330s will be evaluated to determine the most highly qualified firm based on criteria responses. Evaluating past performance and experience may include information provided by the firm, customer inquiries, Government databases, and publicly available sources. Failure to provide requested data, inaccessible points of contact, or invalid phone numbers could result in a firm being considered less qualified. SUBMISSION REQUIREMENTS: The SF 330 Part One is limited to 30 single-sided pages, 8.5?x11?. Complete a SF330 Part Two for the offeror, branch offices and sub-contractors composing the proposed team. Each SF330 Part Two is limited to one page. Submit the following: a) One (1) original and three (3) copies of SF 330 for the prime offeror (SF330 should also include team?s key subconsultants) addressing following selection criteria information; and b) one compact disk copy, in Adobe Acrobat format, of the SF330 being submitted by the firm. SF330, Part I, Section A: Contract Information: In Block 5, list firm?s Dunn and Bradstreet and Taxpayer Identification Number in addition to the name of the firm. SF330, Section D: Organization Chart: In addition to the Instructions provided for the SF 330, identify the overall relationship and lines of authority of the proposed team, including key subconsultants. (Note: All individuals listed on the organization chart are not required to have a resume in Section E, such as administrative or lower level engineering positions.) SF330, Section E: CRITERIA 1, PROFESSIONAL QUALIFICATIONS: Professional Qualifications of the proposed team members assigned to this project in Architect-Engineer (A-E) services including waterfront engineering services, design (for construction and repair), RFP preparation for design-build projects, inspections, hydrographic surveys, planning documents? preparation (Form DD1391), construction support, cost estimates, and related studies for projects involving waterfront facilities, including piers, wharves, quaywalls, marinas, fendering systems, mooring systems, shore protection systems and dredging. Submission Requirements: Provide brief resumes of each proposed team member who will specifically perform the major tasks listed above for this project. All Key personnel must be professionally registered in their discipline. Each resume shall include a maximum of five (5) specific completed projects that best illustrate the individual member?s experience. SF330, Section F, CRITERIA 2, RECENT TEAM EXPERIENCE: Specialized experience and technical competence of the proposed team members assigned to this project experienced in waterfront engineering services, design (for construction and repair), RFP preparation for design-build projects, inspections, hydrographic surveys, planning documents? preparation (Form DD1391), construction support, cost estimates, and related studies for projects involving waterfront facilities, including piers, wharves, quaywalls, marinas, fendering systems, mooring systems, shore protection systems and dredging. Submission Requirements: For each firm, provide a maximum of ten (10) specific completed projects that best illustrate overall team experience. Include within block 24 of SF330, Section F, a brief narrative of performance for respective project. Discuss effectiveness by listing budget/estimated cost, award amount, final design estimate, change order rate and adherence to performance schedules. SF330, Section G, Key Personnel Participation in Example Projects: Submit in accordance with the SF 330 Instructions. From the total projects listed in Section F, provide a maximum of ten (10) projects. SF330, Section H, Additional Information requested by Agency. Address the remaining Criteria 3 through 8; additional sheets may be used, if required. Clearly identify the Criteria number and title. CRITERIA 3, PAST PERFORMANCE: Past performance with Government agencies and private industry with respect to quality of work. Points of contact provided in other criteria may be contacted. A proposal with no record of relevant past performance information shall be evaluated neither favorably nor unfavorably. Submission Requirements: For each project provided as experience under Criteria 2, list any applicable awards and commendations. Other performance evaluation results and awards may also be listed separately. Reference agency/company issuing evaluation/award/commendation and respective date. If a federal contract, state evaluation type and rating. If not a federal contract, provide any applicable similar evaluation information. If no documentation exists, so state. CRITERIA 4, QUALITY CONTROL: Demonstrated success of the Quality Control (QC) program used by the firm to ensure quality products. Submission Requirement: a) Provide an organization chart that identifies the overall relationship and lines of authority of the proposed team. Include firm names, key personnel and their discipline/specialty; b) Describe the prime?s QC program; who is primarily responsible for the QC program, how does the prime firm ensure quality consistently across the entire team. Illustrate success in implementing the program; and c) Address the team?s QC processes for checking and verifying plans and specifications for errors, omissions and quality, documenting design decisions, and incorporating and tracking review comments. Of special interest are the QC processes in place that minimize the government?s effort to QA the A/E?s work product for errors, omissions, and quality. CRITERIA 5, CAPACITY: Capacity to accomplish the work in the required time. Submission Requirement: Describe firm?s capacity to accomplish work in required time frames. Indicate the firm?s present workload and the availability of the project team (including consultants) for the specified contract performance period. Indicate specialized equipment available. Indicate the firm?s and key personnel prior security clearances. CRITERIA 6, SUSTAINABLE DESIGN: Demonstrated success and knowledge in sustainable design. Submission Requirements: Describe the team?s experience in sustainable design, use of the U.S. Green Building Council LEED System including descriptions of waste reduction techniques and energy efficiency in facilities designed by the team, and familiarity with use of recovered materials on construction contracts per FAR 52.223-9. CRITERIA 7, LOCATION: Firm?s demonstrated knowledge of the general geographical areas in which projects could be located. Firm?s location of main offices, branch offices, and sub consultants offices, The Firm?s ability to perform work in the geographical area. Submission Requirements: Describe and illustrate the team?s knowledge and availability to work in the FEC Southwest area of responsibility consisting of California, Arizona, Nevada, New Mexico, Oregon, Idaho, Alaska, Washington, Montana and Utah. The preponderance of the work will be in Southern California. CRITERIA 8, COMMITMENT TO SMALL BUSINESS CONCERNS (Large business firms only) (SEPARATE FOLDER): Use of small business concerns as subconsultants. Submission Requirement: Demonstrate commitment and use of small business concerns as subconsultants on this contract. Provide a chart with each small business category, identify the proposed names of the small businesses, and the dollar amount and subcontracting percentage the prime anticipates subcontracting to each firm. Additionally, provide a brief narrative as to how your firm will meet the following small business subcontracting goals: Small Business (SB)?35%; Small Disadvantaged Business?7%; Women-Owned SB?10%; HUBZone ? 3%; Service-Disabled Veteran-Owned SB?3%; Veteran-Owned SB?3%; and NOTE: If a large business firm is selected for award, an acceptable subcontracting plan that reflects a minimum of subcontracting goals stated above must be submitted before price negotiations begin for contact award. CRITERIA 9, VOLUME OF WORK. Volume of DOD work awarded to firm in past 12 months with objective of equitably distributing contracts among firms, including minority owned firms and firms without prior DOD contracts. Submission Requirement: Provide a list of DOD contracts awarded in the last 12 months. Firms with multiple offices shall indicate which branch office completed each project. Include agency phone numbers and points of contact. SELECTION INTERVIEW REQUIREMENTS: Personal interviews may be scheduled for firms slated as most highly qualified. Firms slated for interviews may be asked to explain management and the Firms abilities. Elaborate presentations are not desired. ADDITIONAL INFORMATION: All information must be included in the SF 330 package, (cover letter, attachments and excess number of pages will be excluded from the evaluation process). Per DFAR 252.204.7004, firms must be registered with Central Contractor Registration prior to contract award. Registration information is available at their website, http://www.ccr.gov. Those firms that meet the requirements in this announcement and wish to be considered must submit the SF330 per Submission Requirements above, to: SOUTHWEST DIVISION, NAVAL FACILITIES ENGINEERING COMMAND, Code RAQ20.VS, 1220 Pacific Highway, Attn: Vanessa Schutt, San Diego, CA 92132-5187, no later than 2:00 p.m. local time, PST, on 29 September 2005. Submittals received after this date and time will not be considered. Firms not providing the required information may be negatively evaluated. Facsimile submittals will not be accepted. Site visits will not be arranged during this period. Debriefing requests will not be entertained prior to 45 days after the submittal due date. THIS IS NOT A REQUEST FOR PROPOSAL. ALL INFORMATION NEEDED TO SUBMIT SF 330 DOCUMENTS IS CONTAINED HEREIN. NO SOLICITATION PACKAGE, TECHNICAL INFORMATION, OR BIDDER/PLAN HOLDER LIST WILL BE ISSUED. It is the offeror?s responsibility to check the NAVFAC electronic solicitation website at: http://esol.navfac.navy.mil for any revisions to this announcement or other notices. E-mail address for inquiries is: vanessa.schutt@navy.mil. *** END OF ANNOUNCEMENT ***
- Place of Performance
- Address: California, Arizona, Nevada, New Mexico, Oregon, Idaho, Alaska, Washington, Montana and Utah. Preponderance of work will be in Southern California
- Country: U.S.A.
- Country: U.S.A.
- Record
- SN00882929-W 20050901/050830212706 (fbodaily.com)
- Source
-
FedBizOpps.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |