FBO DAILY ISSUE OF SEPTEMBER 01, 2005 FBO #1375
MODIFICATION

28 -- Natural Gas Engine-Driven Generator

Notice Date
8/30/2005
 
Notice Type
Modification
 
NAICS
333611 — Turbine and Turbine Generator Set Units Manufacturing
 
Contracting Office
Social Security Administration, Deputy Commissioner for Finance, Assessment and Management, Office of Acquisition and Grants, 1st Floor, Rear Entrance 7111 Security Blvd., Baltimore, MD, 21244
 
ZIP Code
21244
 
Solicitation Number
SSA-RFQ-05-1560
 
Response Due
9/8/2005
 
Archive Date
9/23/2005
 
Small Business Set-Aside
Total Small Business
 
Description
The purpose of this amendment is to release contractors questions and answers. 1) Question: The ATS ??Are there 2 switches ? an ATS plus an additional Bypass isolation switch? or only one ? What is the size of the ATS ? and then in Part 3 they talk about the by pass switch ??is that mounted in a separate Nema 3R enclosure or the same enclosure? Answer: Paragraph 3.3A states: "Furnish bypass-isolation switch from the same manufacturer of the provided automatic transfer switch and bypass isolation switch shall be in the (same) enclosure as the automatic transfer switch." Dimensions will vary between manufactures, however a 400A enclosure with a bypass-isolation switch is approximately 3 feet wide, 2.5 feet deep, and 6 feet tall. 2) Question: Will rubber isoltaor be acceptable which meet seismic zone 4 ? vs rubber ? Answer: Paragragh 2.1E.2 specifies steel spring type vibration isolators, and that will remain the requirement, as specified. 3) Question: Our control panel has analog meters vs. digital is that acceptable? Answer: Paragraph 2.1G1.a, specifies instruments and controls to be microprocessor based and digital, and that will remain the requirement, as specified. 4) Question: Our de arrangement annunciator panel is a phenolic plastic plate vs. a brushed stainless steel is that acceptable? Answer: Phenolic plastic plate will be acceptable. 5) Question: Our circuit breaker is in a Nema 1 enclosure and inside the generator set enclosure but not a Nema 12? Answer: Paragragh 2.1H3.a, specifies a NEMA type 12 main circuit breaker enclosure, and that will remain the requirement, as specified. 6) Question: Over voltage / Under voltage alarms ? shutdowns ? are not required on a unit of this size ?..overkill and a waste of money? Answer: The specific design requirements for this project specify over/under voltage alarms and shutdown, and that will remain the requirement, as specified.
 
Place of Performance
Address: Social Security Administration, Social Security Field Office, 950 Borom Road, York, PA
Zip Code: 17404
Country: USA
 
Record
SN00883067-W 20050901/050830212917 (fbodaily.com)
 
Source
FedBizOpps.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.