Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF SEPTEMBER 24, 2005 FBO #1398
SOLICITATION NOTICE

Y -- Chiloquin Dam, MPDI Pumping and Fish Screen Project

Notice Date
9/22/2005
 
Notice Type
Solicitation Notice
 
Contracting Office
Bureau of Indian Affairs, Northwest Regional Office, Branch of Administration, Contracts and Grants, 911 N.E. 11th Avenue, Portland, Oregon 97232
 
ZIP Code
97232
 
Solicitation Number
RMP00060001
 
Response Due
11/22/2005
 
Archive Date
11/30/2005
 
Description
The Bureau of Indian Affairs (BIA) Portland, OR, intends to issue an Request for Proposal (RFP) for a firm-fixed price construction contract for the Chiloquin Dam Removal, Modoc Point Irrigation District (MPID) Pumping Plant and Fish Screen Project. BIA has a requirement to perform construction work at Chiloquin Dam and adjacent lands. Chiloquin Dam is located on the Sprague River while the MPID Pumping Plant and Fish Screen shall be constructed on the Williamson River. The principal components of work include (A) SITE CONSTRUCTION 1) diversion and care of Sprague River and controlling water during demolition, 2) removing Chiloquin Dam and appurtenant structures, 3) removing miscellaneous materials and equipment at Chiloquin Dam site, 4) removing fish screen at the Kircher property, 5) clearing, grubbing and stripping topsoil from work areas, 6) constructing a steel sheet pile cofferdam at the pumping plant site on the Williamson River and removing and controlling water during construction, 7) excavating earth materials for construction of pumping plant structures, pipeline, outlet structures and access, 8) placing and compacting backfill for pumping plant service yard, 9) constructing an access road to the pumping plant, 10) placing and compacting backfill in a portion of MPID Main canal, 11) furnishing and placing riprap using geotextile underlayment and coarse gravel protection, 12) furnishing and laying PVC pressure pipe for discharge pipeline and Kircher property water delivery system, 13) excavating, backfilling, and compacting backfill in pipe trenches, 14) furnishing, placing and compacting gravel surfacing on pumping plant service yard and access road, 15) furnishing and erecting chain link fence around pumping plant service yard, 16) furnishing and erecting w-beam guardrail and handrail at the pumping plant, 17) constructing drain system for pumping plant retaining wall and transition structure, 18) placing topsoil and seeding; (B) CONCRETE CONSTRUCTION 1) constructing reinformced cast-in-place concrete for pumping plant substructure, discharge manifold encasements, outlet structure, and utility building foundation; (C) FABRICATED METAL WORK 1) furnishing and installing fabricated metalwork including ladders, frames, gratings, covers, and handrail, 2) furnishing and installing ladder and fall protection rail system for pumping plant building, 3) furnishing and installing steel piping; (D) DOORS 1) furnishing and installing steel doors and door hardware for pumping plant building and utility building, 2) furnishing and installing floor access hatches at the pumping plant; (E) FINISHES 1) coating fabricated metalwork, mechanical items, doors and frames, 2) repair painting damaged coatings; (F) SPECIALTIES 1) furnishing and installing fire extinguishers, 2) furnishing and wall louvers; (G) EQUIPMENT 1) furnishing and installing trashrack for discharge line outlet structure, 2) furnishing and installing stoplog seats and guides, 3) furnishing and installing fish screens, 4) furnishing and installing adjustable baffles, 5) furnishing and installing vertical turbine pumps, line shaft, column pipe, discharge heads, and miscellaneous components, 6) furnishing and installing vertical induction motors and a vertical inverter rated motor, 7) furnishing and installing valves and equipment; (H) SPECIAL CONSTRUCTION 1) designing, furnishing, and erecting metal building system for pumping plant, 2) furnishing and erecting prefabricated metal utility building, 3) designing, furnishing, and installing smoke alarm system, 4) furnishing and installing water-level measuring devices, 5) furnishing and installing intake (sump) level monitoring system; (I) MECHANICAL 1) furnishing and installing drainage sump pumping unit, 2) furnishing and installing air burst cleaning system, 3) furnishing and installing heating and ventilating system; (J) ELECTRICAL 1) furnishing and installing grounding and bonding, conductors and cables, and electrical conduit, 2) furnishing, and installing conduit system and conductors, 3) furnishing and installing wiring devices, 4) furnishing and installing motor control equipment, 5) furnishing and installing power and controls for exhaust fans, 6) furnishing and installing interior and exterior lighting system. The work has in-water-work periods for the Sprague and Williamson Rivers during July 1 through January 31, 2007. Chiloquin Dam removal cannot commence until MPID Pumping Plant is tested and completed. The value of the work is in the range of $5 million to $10 million. This procurement will require 100% performance and payment bonds. As the BIA does not have internet capability, all requests for solicitation, inquiries and questions shall be submitted in writing, mailed and addressed to Tami Gallegos, Bureau of Indian Affairs, Branch of Adminstraction, Contracts & Grants, 911 NE 11th Avenue, Portland, Oregon 97232. All requests shall include name, phone number, mailing address and solicitation number RMP00060001. The NAICS code is 234990 (All Other Heavy Construction).
 
Record
SN00901751-W 20050924/050922212354 (fbodaily.com)
 
Source
FedBizOpps.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.