SOLICITATION NOTICE

61 -- Perform one General Electric frame 5 combustion turbine replacement, and perform initial commissioning for GE Frame 5 gas turbine generator units at the Old Mulla electric generation plant in Iraq

Notice Date
12/22/2005
 
Notice Type
Solicitation Notice
 
NAICS
221119 — Other Electric Power Generation
 
Contracting Office
Department of the Army, Project and Contracting Office, Joint Contracting Command-Iraq, PARC Reconstruction, US Embassy Palace APO, Baghdad, Iraq, AE, 09316
 
ZIP Code
09316
 
Solicitation Number
W91GXY-06-R-0022
 
Response Due
1/10/2006
 
Archive Date
1/25/2006
 
Description
This upcoming solicitation will be for a Fixed Price Contract for the contractor to transport to a site in Iraq and perform one General Electric frame 5 combustion turbine replacement, and perform initial commissioning for GE Frame 5 gas turbine generator units at the Old Mulla electric generation plant in Iraq. Old Mulla is near Kirkuk approximately 300km north of Baghdad, Iraq. The objective is to transport to site a replacement engine, currently in storage near Basra, in Iraq, and replace the existing gas turbine generator unit installed at Al Mulla in Iraq. Following installation of the new engine re-commissioning and test. Purchase Original Equipment Manufacturer (OEM) or equal parts as needed to complete the work. The scope of work also includes carrying out an annual inspection, verification/ service of all auxiliary systems to support the turbine, associated generator, excitation system, lube oil systems, accessory equipment, fuel supply system, fire system fuel treatment equipment (if applicable), providing and installing a complete set of new air intake filters. Due to the "fast-track" nature of the project, the contractor must endeavour to use reasonable measures to ensure that the parts are delivered in time to support the scope of supply and that the work is performed within the PCO?s allotted timeframe taking into consideration all recommendations, conditions, special conditions, the quoted work scope, the scope of supply and all other aspects. The solicitation will be posted to the Project and Contracting Office website, once released. In order to locate the solicitation, go to the website:http://www.rebuilding-iraq.net, follow the link to ?New Solicitations? and then to ?PCO Solicitations?. The solicitation is expected to be posted on or about 27 December 2005.
 
Place of Performance
Address: Old Mulla electric generation plant
Country: Iraq
 
Record
SN00957023-W 20051224/051222212321 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.