SOLICITATION NOTICE

41 -- 3-Ton Air Conditioner and Installation Services

Notice Date
4/3/2006
 
Notice Type
Solicitation Notice
 
NAICS
333415 — Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment Manufacturing
 
Contracting Office
Department of Homeland Security, Customs and Border Protection, Office of Procurement, 1300 Pennsylvania Avenue, N.W., Room 1310 NP, Washington, DC, 20229
 
ZIP Code
20229
 
Solicitation Number
HSBP060729
 
Response Due
4/3/2006
 
Archive Date
4/18/2006
 
Small Business Set-Aside
Total Small Business
 
Description
The Department of Homeland Security (DHS), Customs and Border Protection (CBP), U.S. Border Patrol (USBP), Laredo Sector, Laredo, Texas, is issuing a combined synopsis/solicitation for commercial items prepared in accordance with the format in Federal Acquisition Regulations document (FAR) subpart 12.6, and as supplemented with additional information included in this notice. This announcement constitutes the only solicitation. No written solicitation will be issued. Solicitation Number HSBP060729 is used for reference purposes. This procurement is set-aside for small business. Award will be made to the technically acceptable, lowest priced quote from a responsible/responsive contractor. The following provisions apply to this acquisition: FAR 52.212-1, Instructions to Offerors; Commercial Items, FAR 52.212-2 Evaluation Commercial Items; FAR 52.212-3 Offeror Representations and Certifications-Commercial Items should be submitted with the Contractors? responses/quotes; FAR 52.212-4 Contract Terms and Conditions; FAR 52.219-6 Notice of Total Small Business Set-Aside; FAR 52.222-35; Equal Opportunity for Special Disabled Veterans, Veterans of the Vietnam Era and of the Eligible Veterans (Eec 2001) (38 U.S.C. 4212; FAR 52.222-36 Affirmative Action for Workers with Disabilities (Jun 1998) (29 U.S.C. 793); FAR 52.225-1 Buy American Act Supplies (Jun 2003) (41 U.S.C.10z?10d); 52.225.12 Restrictions on Certain Foreign Purchases (Oct 2003P; FAR 52.225-16 Sanctioned European Union Country End Products (Feb 2000) (E.O.>12849); FAR 52.232-33 Payment by Electronic Funds Transfer?Central Contractor Registration; FAR 52.204-7 Contractor Central Registration; CCR Requirement - Offeror must be registered on Central Contractor Registration (CCR) before an award could be made to them. If offeror is not registered in CCR, they may do so by going to CCR web site at http://www.ccr.gov. These provisions and clauses are incorporated by reference and the full text of a FAR clause may be accessed electronically at http://www.acqnet.gov/far. QUOTE DUE DATE: By 4:00 PM Central Standard Time on April 13, 2006. Facsimile quotes are acceptable to (956) 764-3272 ATTN: Patricia Pequeno; or email to patricia.pequeno@dhs.gov ; or mail to Customs and Border Protection/U.S. Border Patrol, ATTN: Patricia Pequeno, 207 W. Del Mar Blvd., Laredo, TX 78041 or hand deliver same address. Please direct all inquires to Patricia Pequeno @ patricia.pequeno@dhs.gov or (956) 764-3282. Statement of Work: Intent: To install 3-ton air conditioner for the 940 CEB room, building A, and set the existing air conditioner as a redundant/back up unit. Connect panel LC in 940 CEB room building A, and panel A in main CEB room building B to their emergency generator panels. The 940 CEB Room, Building A has had electrical equipment added to it for years. This has increased the heat load at or beyond that of the two-ton units. General Requirements: Contractor will be responsible for the purchase and installation of all materials. All materials used by contractor will be new. The contractor is responsible for the cost of repairing or replacing (at the discretion of the COTR) all Government property that is damaged by the prime contractor or any of its sub-contractors, such as but not limited to walls, floors, fixtures, etc. The contractor is responsible for repairing and cost of all items it damages below grade and during any excavation. All work will meet or exceed Municipal, Local, State, and National, (NEC, FCA, IEEE, NEMA, ANSI), codes and standards that apply, all items will be installed according to manufacture recommendations, and be consistent with work done at the journeyman, craftsman, level. Contractor shall perform a site inspection to study and ascertain size, amount, and type of materials needed and observe the sites general layout before being allowed to bid on this project. This is a turnkey project, all-inclusive single source of equipment materials and installation.
 
Place of Performance
Address: Customs and Border Protection, U.S. Border Patrol, 207 W. Del Mar Blvd.
Zip Code: 78041
Country: US
 
Record
SN01019847-W 20060405/060403220143 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.