SOLICITATION NOTICE
Y -- Ward Creek Trail Bridge and Trail Contruction Project
- Notice Date
- 4/28/2006
- Notice Type
- Solicitation Notice
- NAICS
- 237310
— Highway, Street, and Bridge Construction
- Contracting Office
- Department of Agriculture, Forest Service, R-5 IBET Province, Tahoe N.F., 631 Coyote Street, Nevada City, CA, 95959-2250
- ZIP Code
- 95959-2250
- Solicitation Number
- AG-9A63-S-06-0070
- Response Due
- 6/29/2006
- Archive Date
- 7/14/2006
- Description
- The Ward Creek Trail Bridge project, located on the Lake Tahoe Basin Management Unit, consists of a prefabricated, weathered steel, through-truss superstructure, decked with pressure treated Douglas-Fir timber planks, and supported on cast-in-place, reinforced concrete stub abutments doweled to bedrock. The pedestrian bridge is 54 feet long by 6 feet wide between bridge rails. The trailwork associated with the project includes trail reroute, streambank restoration, trail obliteration, and existing trail restoration. The Tahoe Rim Trail at the Ward Creek Crossing can be accessed by traveling south from Tahoe City, Plaser County, on California highway 89 to road 15N02. Take 15N02 east to Forest Service Road 15N62-available with Forest Service permission. Travel Forest Service Road 15N62 to the Ward Creek crossing. The project is located within Section 21, Township 15N, Range 16E. Estimated start work date is August 7, 2006, contract time is 113 days. Estimated Solicitation issue date is May 29, 2006.
- Place of Performance
- Address: South Lake Tahoe, CA
- Record
- SN01037151-W 20060430/060428220250 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |