SOLICITATION NOTICE
Y -- Design-Build Construction of Early Site Work for Construction of New Embassy Compound in Beirut, Lebanon
- Notice Date
- 5/11/2006
- Notice Type
- Solicitation Notice
- NAICS
- 236220
— Commercial and Institutional Building Construction
- Contracting Office
- Department of State, Office of Logistics Management, Acquisition Management, P.O. Box 9115 Rosslyn Station, Arlington, VA, 22219
- ZIP Code
- 22219
- Solicitation Number
- SALMEC-06-R-0080
- Response Due
- 6/14/2006
- Archive Date
- 7/31/2006
- Description
- American Embassy Beirut, New Embassy Compound Early Site Work The American Embassy in Beirut, Lebanon has acquired a site of approximately seven hectares (7 ha) in the Baabda Municipality of Beirut adjacent to the Baabda ? Hadath Highway for development of a New Embassy Compound (NEC). In the coming months, the Office of Overseas Buildings Operations, United States Department of State in Washington (USG) intends to request proposals for design and construction of permanent buildings and other improvements on the NEC. In preparation for this future major contract, the USG requires design-build services for Early Site Work on the property now under a separate contract. The Early Site Work consists of design and construction services for the following: Permanent perimeter Anti-Ram Wall and Permanent perimeter Anti-climb Wall based on Standard Embassy Design details; demolishing an existing concrete wall; a new driveway through the NEC site connecting Bezancon Road with the Baabda-Hadath Highway, including retaining walls, engineered fill, base paving course, and storm drainage system; and related rough grading, excavation, erosion control, and stock piling of soils; and the procurement, shipping, erection, and commissioning inside the Wall of prefabricated temporary housing and office structures for USG use after completion of the Early Site Work contract. The USG will provide technical information for use in the Early Site Work design including boundary, topographic, and utility surveys of the existing conditions; some preliminary geotechnical information; Standard Embassy Design elements, examples of acceptable prefabricated housing; and early site designs of the compound development. The contract will require completion of preliminary designs and preparation of construction documents for all work to be constructed, and obtaining and paying for all permits and fees required for the work of this contract. The contractor may be allowed to fast-track (that is, overlap the schedules for) design and construction of tasks on the critical path of the project; however, the start of construction work for each task under the contract will not be authorized before design work required under the contract the task has been reviewed by the USG. The USG anticipates issuing requests for proposals on June 23, 2006, and requires all construction work to be completed and as-built records delivered by January 31, 2007.................Estimated Design-Build Cost Range $1-5 million.
- Place of Performance
- Address: Beirut
- Country: Lebanon
- Country: Lebanon
- Record
- SN01046221-W 20060513/060511220506 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice