Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF JUNE 22, 2006 FBO #1669
SOLICITATION NOTICE

Y -- Kline Mt. Road Rehabilitation Project

Notice Date
6/20/2006
 
Notice Type
Solicitation Notice
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
Department of Agriculture, Forest Service, R-4 SW Idaho/Nevada Acquisition Office, 1249 S. Vinnell Way, Suite 200, Boise, ID, 83709
 
ZIP Code
83709
 
Solicitation Number
RFP-AG-0261-S-06-0044
 
Response Due
8/8/2006
 
Archive Date
9/30/2006
 
Description
RFP-AG-0261-S-06-0044 - Kline Mt. Road Rehabilitation Project. Solicitation Package will be available for viewing and printing in approximately 15 days. The work consists of reconstructing 1.9 miles of existing road in the South Fork of the Salmon River drainage near Warm Lake. Specific work includes: roadside clearing; road reconditioning; replacement and installation of new culverts; survey, design, and installation of 2 Mechanically Stabilized Earth Walls; erosion control using straw bales and straw wattles; and furnishing and placing surface course aggregate. A disposal site for construction waste materials, other than construction slash, has been designated at the Waste Transfer Site, approximately 1 mile northeast of the beginning of the project, on the north side of the Warm Lake Highway. Estimate Start Work Date is October 01, 2006. No ground disturbing construction work is permitted until the 2007 season, estimated to start June 1, 2007. The only on-site work permitted under this contract until that time is the site survey work necessary for the design and preparation of submittals for the 2 mechanically stabilized earth walls, and removal of field samples of road embankment material at each site for testing required by FSSS 255. The designated water drafting site is on Road 474, at the crossing of Bear Creek, approximately 1 mile south of the end of the project. The project is located on the Cascade Ranger District, Boise National Forest, Valley County, Idaho. The work is on Forest Road 474. Take Rd. 579, Warm Lake Highway, just north of Cascade on State Highway 55, and continue for approximately 23 miles. Rd. 474 is on the right. The project begins at the intersection with Warm Lake Highway and continues for 1.91 miles south on the 474 road. Estimated contract time is 335 calendar days for completion. Estimated price range is between $100,000.00 and $250,000.00. NAICS Code: 237310 Size Standard: 31.0 Million This proposed procurement is under the Small Business Competitiveness Demonstration Program, which is not a small business set aside.
 
Place of Performance
Address: Cascade, Idaho
 
Record
SN01073554-W 20060622/060620220209 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.