SOLICITATION NOTICE

Z -- B430 REMODEL

Notice Date
6/21/2006
 
Notice Type
Solicitation Notice
 
NAICS
236210 — Industrial Building Construction
 
Contracting Office
Department of the Air Force, Air Force Materiel Command, Hill AFB OO-ALC, OO-ALC/PKXD 6038 Aspen Ave (Bldg 1289), Hill AFB, UT, 84056
 
ZIP Code
84056
 
Solicitation Number
FA8201-06-B-0009
 
Response Due
8/7/2006
 
Archive Date
12/1/2006
 
Description
Synopsis of Requirement: This effort will include but is not limited to the following services: 1. ARCHITECTURAL: Remove and demolish all interior non-bearing walls and finishes, including floor coverings, ceilings, lighting as indicated on the drawings. Structural walls shall remain and the exterior shell shall remain in place. Install a single-ply roof system over the existing built-up roof with new weather-tight flashing. Install new finishes throughout with insulated furred out walls, raised computer floors, new carpeting, sheet rock walls, lay-in ceilings and new lighting throughout for a complete tenant improvement. Provide and install all new doors, hardware, frames, storefront glazing etc. throughout the space. 2. CIVIL: Remove and demolish the rear dock area and associated parking lot as indicated on the drawings. Install new patio area where the dock area was and construct a new parking lot configured to meet accessibility and force protection requirements. Reuse existing catch basins and storm drain systems already in place. Trench for new electrical service from existing transformer to the south of the building and patch and repair existing road to remain. Install new landscaping in the areas around the new parking lot and the south elevation. New landscaping to meet force protection guidelines. 3. MECHANICAL: Remove all existing mechanical equipment and all duct distribution as noted in the drawings and construct with new equipment new mechanical systems and duct distribution. Install new roof top units. Install new plumbing fixtures as noted in the drawings with additional fixtures as shown. Bring all fixtures current with accessibility requirements. Use existing underground plumbing but otherwise cap unused plumbing below slab. Mechanical and plumbing systems shall be brought up current to existing code requirements. Reconfigure the existing fire sprinkler lines and heads as required for the new building room configuration and reuse from existing backbone where possible. The new space shall be fully sprinkled meeting current codes. 4. ELECTRICAL: Remove all existing electrical switches, lighting, power distribution and panels within the building. Install new electrical equipment beyond the existing transformer, provide and install new outlets, lighting and distribution of telecommunications and data information throughout the building meeting the new tenant improvement requirements. Electrical power and lighting systems, including emergency lighting an egress illumination shall meet currently code requirements. Place of Contract Performance. Hill Air Force Base, Utah., Building 430 Full & Open
 
Record
SN01074635-W 20060623/060621220747 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.