Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF JULY 01, 2006 FBO #1678
SOLICITATION NOTICE

Z -- Repair HVAC, Bldgs 236 and 280, Pope AFB, NC

Notice Date
6/29/2006
 
Notice Type
Solicitation Notice
 
NAICS
238220 — Plumbing, Heating, and Air-Conditioning Contractors
 
Contracting Office
Department of the Air Force, Air Mobility Command, 43rd CONS, 1443 Reilly Rd Suite C, Pope AFB, NC, 28308-2896
 
ZIP Code
28308-2896
 
Solicitation Number
FA4488-06-R-0005
 
Response Due
7/31/2007
 
Archive Date
8/15/2006
 
Description
Work consists of contractor furnishing all labor, material, equipment, supervision, work and facilities necessary to perform all operations, in strict accordance with specifications and applicable drawings for Project A (Bldg 236) and Project B (Bldg 280), subject to terms and conditions of the contract. The scopes of work for both projects are identical and include the following: (1) selective demolition of existing HVAC system; (2) installation of the new ductwork; (3) installation of new coil fan units; (4) installation of new hydronic piping systems; and (5) installation of new acoustical ceilings. Any demolition will either be recycled or disposed of at the Ft Bragg landfill. The North American Industry Classification System (NAICS) is 238220 and the size standard is $12 mil. Awards will be Firm Fixed Price contracts and the total performance period is 180 days per project. The magnitude of each project is between $500,000 and $1,000,000. These acquisitions are being solicited under full and open competition conditions. The entire solicitation, which will include both projects and their respective specifications and drawings, is paperless and will be available via the Electronic Posting System (EPS) . Amendments will be provided on the internet only. Once the solicitation is posted, it is incumbent upon the interested parties to review this site frequently for any updates/amendments to any and all documents. Telephone and fax requests will not be honored. **NOTE: All contractors must be registered in the Centralized Contractor Registration (CCR) program in order to receive a contract award from any DOD activity. Contractors may access the Internet site at: http://www.ccr.gov to register and/or obtain information about the CCR program. ***FUNDS ARE CURRENTLY NOT AVAILABLE FOR EITHER PROJECT.*** No award will be made under this Request For Proposal (RFP) until funds are available. The Government reserves the right to: (1) cancel this RFP before or after receipt of proposals, (2) fund only one project, or (3) fund both projects, with no obligation to the offeror by the Government in accordance with FAR 52.232-18, Availability of Funds (Apr 1984). Proposals for each project should be separate and independent of each other. This notice does not obligate the Government to award a contract nor does it obligate the Government to pay for any proposal preparation costs. **The consolidated solicitation will be available on or about 29 Jul 2006. ** POC: Primary - Dana Jones, (910) 394-5508, dana.jones@pope.af.mil or Alternate - Kevin Jun, (910) 394-5507, kevin.jun-01@pope.af.mil
 
Place of Performance
Address: Bldg 236 and/or Bldg 280, Pope AFB, NC
Zip Code: 28308
Country: USA
 
Record
SN01080333-W 20060701/060629221008 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.