Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF JULY 01, 2006 FBO #1678
SOLICITATION NOTICE

Y -- Y--Heavy Equipment Rental IDIQ contract at Mid-Columbia River National Refuge Complex. Bids on a per hour with operator basis.

Notice Date
6/29/2006
 
Notice Type
Solicitation Notice
 
Contracting Office
Division of Contracting and General Services U.S. Fish & Wildlife Service 911 NE 11th Avenue Portland OR 97232
 
ZIP Code
97232
 
Solicitation Number
101816Q483
 
Response Due
7/10/2006
 
Archive Date
6/29/2007
 
Small Business Set-Aside
Total Small Business
 
Description
RENTAL OF EARTH-MOVING EQUIPMENT WITH OPERATORS AS REQUIRED FOR WORK ON THE MID-COLUMBIA RIVER REFUGE COMPLEX AND COLUMBIA REFUGE COMPLEX, OTHELLO WASHINGTON Item No. 1 - Elevating Scraper Rental on an hourly basis of one each rubber-wheeled self-loading laser-equipped elevating scraper with operator with not less than 250 SAE net flywheel horsepower at rated speed and a heaped capacity of not less than 16 cubic yards (Caterpillar 615 Series, John Deere 862 Series, or equivalent). Operating Cost (Unit Price per Hour) $ _____ Move-In (Mobilization) Move-Out (Demobilization) Cold Springs NWR (Hermiston, Oregon) $_____ $_____ McKay Creek NWR (Pendleton, Oregon) $_____ $_____ McNary NWR (Burbank, Washington) $_____ $_____ Toppenish NWR (Toppenish, Washington) $_____ $_____ Umatilla NWR (Irrigon, Oregon) $_____ $_____ Umatilla NWR (Paterson, Washington) $_____ $_____ Conboy NWR (Goldendale, Washington) $_____ $_____ Columbia NWR (Othello, Washington) $_____ $_____ Saddle Mountain NWR (Mattawa, Washington) $_____ $_____ Maximum Mobilization Time (Calendar Days) _____ Days Item No. 2 - Hydraulic Excavator Rental on an hourly basis of one each crawler-mounted hydraulic excavator with operator with not less tha 115 SAE net flywheel horsepower at rated speed, standard width tracks, minimum 30-foot reach at grade with the following bucket configurations: minimum one cubic yard heaped capacity bucket, bucket with hydraulic thumb and "muck" bucket with a minimum six foot width (Caterpillar 215 Series, John Deere 690 Series or equivalent). Operating Cost (Unit Price per Hour) $ _____ Move-In (Mobilization) Move-Out (Demobilization) Cold Springs NWR (Hermiston, Oregon) $_____ $_____ McKay Creek NWR (Pendleton, Oregon) $_____ $_____ McNary NWR (Burbank, Washington) $_____ $_____ Toppenish NWR (Toppenish, Washington) $_____ $_____ Umatilla NWR (Irrigon, Oregon) $_____ $_____ Umatilla NWR (Paterson, Washington) $_____ $_____ Conboy NWR (Goldendale, Washington) $_____ $_____ Columbia NWR (Othello, Washington) $_____ $_____ Saddle Mountain NWR (Mattawa, Washington) $_____ $_____ Maximum Mobilization Time (Calendar Days) _____ Days Item No. 3 - Water Tanker Rental on an hourly basis of one each on-highway water tanker with operator with a minimum 3,000 gallon tank capacity and the capability for pressurized discharged. Operating Cost (Unit Price per Hour) $ _____ Move-In (Mobilization) Move-Out (Demobilization) Cold Springs NWR (Hermiston, Oregon) $_____ $_____ McKay Creek NWR (Pendleton, Oregon) $_____ $_____ McNary NWR (Burbank, Washington) $_____ $_____ Toppenish NWR (Toppenish, Washington) $_____ $_____ Umatilla NWR (Irrigon, Oregon) $_____ $_____ Umatilla NWR (Paterson, Washington) $_____ $_____ Conboy NWR (Goldendale, Washington) $_____ $_____ Columbia NWR (Othello, Washington) $_____ $_____ Saddle Mountain NWR (Mattawa, Washington) $_____ $_____ Maximum Mobilization Time (Calendar Days) _____ Days Item No. 4 - Dump Truck Rental on an hourly basis of one each on-highway rear dump truck with operator with not less than ten cubic yards struck capacity. Operating Cost (Unit Price per Hour) $ _____ Move-In (Mobilization) Move-Out (Demobilization) Cold Springs NWR (Hermiston, Oregon) $_____ $_____ McKay Creek NWR (Pendleton, Oregon) $_____ $_____ McNary NWR (Burbank, Washington) $_____ $_____ Toppenish NWR (Toppenish, Washington) $_____ $_____ Umatilla NWR (Irrigon, Oregon) $_____ $_____ Umatilla NWR (Paterson, Washington) $_____ $_____ Conboy NWR (Goldendale, Washington) $_____ $_____ Columbia NWR (Othello, Washington) $_____ $_____ Saddle Mountain NWR (Mattawa, Washington) $_____ $_____ Maximum Mobilization Time (Calendar Days) _____ Days Item No. 5 - Crawler-Dozer (standard track, 90hp) Rental on an hourly basis of one each crawler dozer with operator with not less than 90 Net Horsepower, standard track width (Catepillar D5 or equivalent) Operating Cost (Unit Price per Hour) $ _____ Move-In (Mobilization) Move-Out (Demobilization) Cold Springs NWR (Hermiston, Oregon) $_____ $_____ McKay Creek NWR (Pendleton, Oregon) $_____ $_____ McNary NWR (Burbank, Washington) $_____ $_____ Toppenish NWR (Toppenish, Washington) $_____ $_____ Umatilla NWR (Irrigon, Oregon) $_____ $_____ Umatilla NWR (Paterson, Washington) $_____ $_____ Conboy NWR (Goldendale, Washington) $_____ $_____ Columbia NWR (Othello, Washington) $_____ $_____ Saddle Mountain NWR (Mattawa, Washington) $_____ $_____ Maximum Mobilization Time (Calendar Days) _____ Days Item No. 6 - Crawler-Dozer (wide track, 90hp) Rental on an hourly basis of one each crawler dozer with operator with not less than 90 Net Horsepower, wide track width (Catepillar D5 or equivalent) Operating Cost (Unit Price per Hour) $ _____ Move-In (Mobilization) Move-Out (Demobilization) Cold Springs NWR (Hermiston, Oregon) $_____ $_____ McKay Creek NWR (Pendleton, Oregon) $_____ $_____ McNary NWR (Burbank, Washington) $_____ $_____ Toppenish NWR (Toppenish, Washington) $_____ $_____ Umatilla NWR (Irrigon, Oregon) $_____ $_____ Umatilla NWR (Paterson, Washington) $_____ $_____ Conboy NWR (Goldendale, Washington) $_____ $_____ Columbia NWR (Othello, Washington) $_____ $_____ Saddle Mountain NWR (Mattawa, Washington) $_____ $_____ Maximum Mobilization Time (Calendar Days) _____ Days Item 7 - Dozer (standard track 140hp) Rental on an hourly basis of one each crawler dozer with operator with not less than 140 Net Horsepower, standard track width (Catepillar D6 or equivalent) Operating Cost (Unit Price per Hour) $ _____ Move-In (Mobilization) Move-Out (Demobilization) Cold Springs NWR (Hermiston, Oregon) $_____ $_____ McKay Creek NWR (Pendleton, Oregon) $_____ $_____ McNary NWR (Burbank, Washington) $_____ $_____ Toppenish NWR (Toppenish, Washington) $_____ $_____ Umatilla NWR (Irrigon, Oregon) $_____ $_____ Umatilla NWR (Paterson, Washington) $_____ $_____ Conboy NWR (Goldendale, Washington) $_____ $_____ Columbia NWR (Othello, Washington) $_____ $_____ Saddle Mountain NWR (Mattawa, Washington) $_____ $_____ Maximum Mobilization Time (Calendar Days) _____ Days Item 8 - Dozer (standard track 230 hp) Rental on an hourly basis of one each crawler dozer with operator with not less than 230 Net Horsepower, standard track width (Catepillar D7 or equivalent) Operating Cost (Unit Price per Hour) $ _____ Move-In (Mobilization) Move-Out (Demobilization) Cold Springs NWR (Hermiston, Oregon) $_____ $_____ McKay Creek NWR (Pendleton, Oregon) $_____ $_____ McNary NWR (Burbank, Washington) $_____ $_____ Toppenish NWR (Toppenish, Washington) $_____ $_____ Umatilla NWR (Irrigon, Oregon) $_____ $_____ Umatilla NWR (Paterson, Washington) $_____ $_____ Conboy NWR (Goldendale, Washington) $_____ $_____ Columbia NWR (Othello, Washington) $_____ $_____ Saddle Mountain NWR (Mattawa, Washington) $_____ $_____ Maximum Mobilization Time (Calendar Days) _____ Days OPTION NO. 1 FOR THE PERIOD OCTOBER 1, 2006 - SEPTEMBER 30, 2007 Cost same equipment items 1 - 8 for the same refuge locations as initial contract period. OPTION NO. 2 FOR THE PERIOD OCTOBER 1, 2007 - SEPTEMBER 30, 2008 Cost same equipment items 1 - 8 for the same refuge locations as initial contract period. OPTION NO. 3 FOR THE PERIOD OCTOBER 1, 2008 - SEPTEMBER 30, 2009 Cost same equipment items 1 - 8 for the same refuge locations as initial contract period. OPTION NO. 4 FOR THE PERIOD OF OCTOBER 1, 2009 - SEPTEMBER 30, 2010 Cost same equipment items 1 - 8 for the same refuge locations as initial contract period.
 
Web Link
Please click here to view more details.
(http://ideasec.nbc.gov/j2ee/announcementdetail.jsp?serverId=FW144851&objId=278251)
 
Place of Performance
Address: National Wildlife Refuges in Oregon and Washington controlled out of Mid-Columbia River National Wildlife Refuge Complex in Richland, Washington
Zip Code: 99354
Country: US
 
Record
SN01080488-W 20060701/060629221253 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.