MODIFICATION
48 -- OVERHAUL REQUIREMENT - NSN?S: 4810-00-325-0646FG AND 4810-00-087-5175FG (SUBJECT TO QUALIFICATION REQUIREMENTS)
- Notice Date
- 8/30/2006
- Notice Type
- Modification
- NAICS
- 336413
— Other Aircraft Parts and Auxiliary Equipment Manufacturing
- Contracting Office
- Department of the Air Force, Air Force Materiel Command, Tinker OC-ALC - (Central Contracting), 3001 Staff Drive, Ste 1AG76A, Tinker AFB, OK, 73145-3015
- ZIP Code
- 73145-3015
- Solicitation Number
- FA8103-06-R-0420
- Response Due
- 10/16/2006
- Archive Date
- 10/30/2006
- Small Business Set-Aside
- Total Small Business
- Description
- This Synopsis modification supersedes all previous notices. The Government has removed the Contract Repair Enhancement Program (CREP) tenants and will now contemplate multiple awards. See additional changes below. OVERHAUL REQUIREMENT - NSN?S: 4810-00-325-0646FG AND/OR 4810-00-087-5175FG (SUBJECT TO QUALIFICATION REQUIREMENTS) 100-PERCENT SMALL BUSINESS SET-ASIDE. Resulting contractual action (if one awarded) is anticipated to be a Two (2) Year ID/IQ type contract with no option periods. The Government WILL contemplate the award of multiple ID/IQ contracts pursuant to the forthcoming Solicitation. MIN CONTRACT QTY: 75 EA MAX CONTRACT QTY: 2,200 EA (estimate of 1,100 per year) MINIMUM ORDER QUANTITY AFTER 1ST DELIVERY ORDER: 50 EA MAXIMUM ORDER QUANTITY AFTER 1ST DELIVERY ORDER: MAX CONTRACT QUANTITY REMAINING NSN / Part Number: 4810-00-325-0646FG (PN: 135675) AND/OR NSN / Part Number 4810-00-087-5175FG (PN: AV16B1632A1) OEM for PN 135675 : Whittaker (Cage: 79318) OEM for PN AV16B1632A1: ITT Technology (Cage: 73760) DESCRIPTION FOR PART NUMBER 135675 Noun: Motor Operated Gate Valve Applicable to: B52 & KC135 Aircraft Description: NSN item is main firewall shutoff valve. It supplies fuel to the engine. Item is a critical component and failure would force a mission abort. Approx Dimensions: 6.33? x 6.63? x 3.27? Weight: 2.38 lbs Material Content: Aluminum Alloy Destination: TBD Applicable Technical Order(s): 6J15-10-66-363 (latest revision - 1 change, 15 JUL 2005), AND T.O. 8D1-14-77-343 (latest revision - 2 change, 1 FEB 2006) DESCRIPTION FOR PART NUMBER AV16B1632A1 Noun: Motor Operated Gate Valve Applicable to: B52 & KC135 Aircraft Description: NSN item is main firewall shutoff valve. It supplies fuel to the engine. Item is a critical component and failure would force a mission abort. Approx Dimensions: 6.33? x 6.63? x 3.27? Weight: 2.38 lbs Material Content: Aluminum Alloy Destination: TBD Applicable Technical Order(s): 6J15-10-159-3 (latest revision - 2 change, 1 DEC 2005), T.O. 8D1-14-128-3 (latest version ? 15 APR 2001), AND T.O. 8D1-14-129-3 (latest revision - 1 change, 1 FEB 2006) GFM and CAP are NOT authorized. All materials and support equipment will be furnished (CFM). DELIVERY SCHEDULE: Delivery schedule to be 92 EA, 30-Days ARO until completion of Order. If a delivery order is placed with less than 92 EA, that quantity will be required to be delivered within 30-Days ARO. The contractor shall begin production even if all reparable quantities on the delivery orders have not been received. INITIAL PRODUCTION EVALUATION (IPE) *An IPE (Initial Production Evaluation) will be required on all new sources, as well as sources who have not performed the overhaul in the previous 60 months. The contractor will have 30 days to prepare for the IPE. Upon Government IPE acceptance, the contractor will have another 30 days to begin production, on the first delivery order only, in accordance with the Delivery Schedule. (If an IPE is not required, the contractor will have 30 days ARO and repairables to begin production IAW the delivery schedule.) ROB BACK The contractor is authorized to ?Rob-back? subassemblies or parts for installation on another end item to meet delivery requirements. MISCELLANEOUS All serviceables will be shipped from the contractor to the user by utilizing fast transportation methods. Shipping instructions will be provided to the contractor by phone, fax, e-mail, or other electronic means via the Production Manager. A copy of all electronic Wide Area Work Flow (WAWF) DD-250?s will be sent to the PMS within 2 days of shipment. A Quarterly Production Management Review (PMRT) meeting will be required. At least the first PMRT will be held at the contractor?s facility. Subsequent PMRT?s will be held either by telephone or at the contractor?s facility, depending on the status of performance and availability of Government personnel. The Government requests that this be not separately priced and included in the quoted unit prices for the actual overhaul services. A Preaward Survey is required if the apparent successful offer is not a previously proven overhaul service supplier for BOTH NSN?s. Under the authority of FAR 6.302, the proposed contract action is for supplies/services for which the Government intends to solicit and negotiate with only one, or a limited number of sources. Interested parties may identify their interest and capability to respond to the requirement or submit proposals. This notice of intent is not a request for competitive proposals. However, all proposals received within 30 days after date of publication of this synopsis will be considered by the Government. A determination by the Government not to compete this proposed contract based upon responses to this notice is solely within the discretion of the Government. Information received will normally be considered solely for the purpose of determining whether to conduct a competitive procurement. Award will be made only if the offeror, the product/service, or the manufacturer meets qualification requirements at the time of award in accordance with FAR clause 52.209-1. The solicitation will identify the office where additional information can be obtained concerning qualification requirements as cited in each individual solicitation. It is suggested that small business firms or others interested in subcontracting opportunities in connection with the described procurement make contact with the firm(s) listed. Based on market research, the Government is not using the policies contained in FAR Part 12 (Acquisition of Commercial Items) in the planned solicitation for the described supplies or services. However, interested parties may identify to the contracting officer, their interest and capability to satisfy the Government's requirement with a commercial item within 15 days of this notice. AVAILABILITY OF FUNDS CLAUSE SHALL APPLY. NO OBLIGATION MAY BE INCURRED BY THE GOVERNMENT UNTIL FUNDS AVAILABILITY HAS BEEN CERTIFIED.
- Place of Performance
- Address: TO BE DETERMINED
- Record
- SN01129915-W 20060901/060830220939 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |