Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF SEPTEMBER 09, 2006 FBO #1748
MODIFICATION

W -- 250KW Generator Lease

Notice Date
9/7/2006
 
Notice Type
Modification
 
NAICS
333999 — All Other Miscellaneous General Purpose Machinery Manufacturing
 
Contracting Office
Defense Logistics Agency, Logistics Operations, DLA-DSS Corporate Contracting Office, 8725 John J. Kingman Road Suite 0119, Fort Belvoir, VA, 22060-6220
 
ZIP Code
22060-6220
 
Solicitation Number
Reference-Number-CIFA06244998
 
Response Due
9/8/2006
 
Archive Date
9/23/2006
 
Point of Contact
Loretta Buckley, Contract Specialist, Phone 703-767-1194, Fax 703-767-1172, - Loretta Buckley, Contract Specialist, Phone 703-767-1194, Fax 703-767-1172,
 
E-Mail Address
loretta.buckley@dla.mil, loretta.buckley@dla.mil
 
Description
The Defense Logistics Agency (DLA), intends to award on a sole-source basis, per FAR 6.302-1, a base plus-two option year contract to SCMC No 1, LLC for the lease of a 250KW back-up generator located in the building at 111 South Tejon Street, Suite 222, Colorado Springs, CO 80903. The lease includes the Liebert HVAC Unit, two heat pumps, a condenser pump and variable frequency drive. The dollar value for the base plus two options years is $15,000.00 per year for a total of $45,00.00. All responsible sources may submit a proposal which shall be considered by DLA to the Contracting Officer, Loretta C. Buckley, at Defense Logistics Agency (DLA), ATTN: Loretta C. Buckley (DES-A), 8725 John J. Kingman Road, Fort Belvoir, VA 22060. Fax (703) 767-1172 or email loretta.buckley@dla.mil by 12:00 pm, EST, September 8, 2006. No telephone inquiries/responses will be accepted. See Government-wide numbered note 22. The following Questions and Answers are provided: 1) Could you tell me the Output Voltage of the generator? Answer: See #2 below for wattage. The generator is a 480/277 volt system. Phase to Phase or Phase to Ground. Answer: Phase to Phase 2) Could you tell me if the 250 KW is Prime Power or Standby Power? Please se below for explanation. Answer: Stand-by Power 3) What are the minimum and maximum run hours that the generator is going to work Answer: Generator is a backup (stand-by) only and is used in the event of a power outage (with the exception of routine checks and maintenance). 4) Who is going to be in charge of generator maintenance (Oils and filters changes, etc?)? The contractor or the contracting agency Answer: The contractor 5) Is the contractor going to replace and connect the generator? If so, does the contractor need to do some electrical installation for the generator Answer: No, the generator will not be replaced and is already hard-wired to building. 6) Is the due date going to change? Answer: The closing date of the solicitation will remain the same. 7) Is it required that the generator has an ATS (Automatic Transfer Switch)? Answer: Yes
 
Place of Performance
Address: 111 South Tejon Street, Suite 222, Colorado Springs, CO
Zip Code: 80903
Country: UNITED STATES
 
Record
SN01136008-W 20060909/060907220112 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.