SOLICITATION NOTICE
Y -- Christiansted Bypass, Phase 1A-Contract1
- Notice Date
- 9/28/2006
- Notice Type
- Solicitation Notice
- NAICS
- 237310
— Highway, Street, and Bridge Construction
- Contracting Office
- Department of Transportation, Federal Highway Administration (FHWA), Eastern Federal Lands Highway Division, 21400 Ridgetop Circle, Sterling, VA, 20166
- ZIP Code
- 20166
- Solicitation Number
- DTFH71-07-B-00007
- Response Due
- 12/7/2006
- Archive Date
- 12/30/2006
- Description
- Sealed bids from all business concerns will be accepted for the United States Virgin Islands, Christiansted Bypass Project VI NH 66(008), Phase 1A-Contract 1, on St. Croix Island, VI, Solicitation Number DTFH71-07-B-00007. The project consists of grading, drainage, anchor block, ground anchors, paving, erosion control and other work. The project is expected to fall within the price range of $5,000,000 to $10,000,000. Bid documents should be issued on or about October 15, 2006. Bids will be due on or about December 7, 2006. Mail bids to Mr. Aloy W. Nielsen, Deputy Commissioner of Engineering, Virgin Islands Public Works Department, 6002 Estate Anna?s Hope, Christiansted, St. Croix, VI 00820-4428. Copies of project CD-ROM and Plans are available at the above address. Pre-site visit is scheduled for all interested Contractor?s on October 24, 2006 at 10:00 A.M., location will be announced in the solicitation and newspaper ads. Annual Representations and Certifications FAR 52.204-8 (Jan 2006). The Representations and Certifications must be filled-in online at http://orca.bpn.gov/. The required Annual Form Vets-100 must also be filled-in online at http://vets100.cudenver.edu/ per FAR 52.222-37. Use Internet addresses http://www2.efl.fhwa.dot.gov/Documents.aspx or http://www.fbo.gov/spg/DOT/FHWA/71/postdatePrevDays_1.html to check for availability of bid documents. All bid documents can be directly downloaded from this website. Documents will no longer be mailed. Register to receive Email Notification to automatically be notified when a document is added or updated for a specific project. Please send all questions concerning construction projects to eflhd.contracts@fhwa.dot.gov. Include the solicitation number, project name and number, requesting firm and address, a point of contact and telephone number. Requests for 'faxing' or overnight mailing will not be accepted. IMPORTANT SUBCONTRACTING PLANS REQUIREMENT For purposes of this Contract, the DBE subcontracting goal is 20 percent of the total contract amount, as determined by the Virgin Islands Department of Public Works with the concurrence of the Contracting Officer. When the contract goal DBE participation is zero percent (0%), the contractor must still submit a small business subcontracting plan with the solicitation identifying all DBE?s which the contractor intends to use on the project. This Contract will be awarded only to the low responsive and responsible bidder who meets this goal or who demonstrates good faith efforts to do so. Failure to make a good faith effort is defined as willful or intentional failure to perform in accordance with the requirements of this Contract, or willful or intentional action to frustrate the achievement of the Subcontracting Plan, if applicable. Guidance on what constitutes good faith efforts is described in the Virgin Islands Department of Public Works? (VIDPW) approved DBE Program. Copies of the program can be obtained from the VIDPW?s DBE Liaison Officer. For copies of the current DBE Directory contact the VIDPW?s DBE Liaison Officer. Contracting Officer, Contracting Officer Technical Representative, and VIDPW?s DBE Liaison Officer are responsible for approving a reasonable and realistic plan. [FAR 19.705-4] [TAM 1219.201(e)(6)].
- Record
- SN01156917-W 20060930/060928220419 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |