MODIFICATION
48 -- OVERHAUL REQUIREMENT - NSN’S: 4810-00-325-0646FG AND 4810-00-087-5175FG (SUBJECT TO QUALIFICATION REQUIREMENTS)
- Notice Date
- 8/3/2006
- Notice Type
- Modification
- NAICS
- 336413
— Other Aircraft Parts and Auxiliary Equipment Manufacturing
- Contracting Office
- Department of the Air Force, Air Force Materiel Command, Tinker OC-ALC - (Central Contracting), 3001 Staff Drive, Ste 1AG76A, Tinker AFB, OK, 73145-3015
- ZIP Code
- 73145-3015
- Solicitation Number
- FA8103-06-R-0420
- Response Due
- 9/8/2006
- Archive Date
- 12/2/2006
- Point of Contact
- James Chandler, Contract Negotiator, Phone (405) 734-4624, Fax (405) 739-3462,
- E-Mail Address
-
james.chandler@tinker.af.mil
- Small Business Set-Aside
- Total Small Business
- Description
- This Synopsis Modification 03 supersedes all previous notices. The Government has removed the Contract Repair Enhancement Program (CREP) tenants and will now contemplate multiple awards. See additional changes below. OVERHAUL REQUIREMENT - NSN?S: 4810-00-325-0646FG AND/OR 4810-00-087-5175FG (SUBJECT TO QUALIFICATION REQUIREMENTS) 100-PERCENT SMALL BUSINESS SET-ASIDE. Resulting contractual action (if one awarded) is anticipated to be a Two (2) Year ID/IQ type contract with no option periods. The Government WILL contemplate the award of multiple ID/IQ contracts pursuant to the forthcoming Solicitation. MIN CONTRACT QTY: 75 EA MAX CONTRACT QTY: 2,200 EA (estimate of 1,100 per year) MINIMUM ORDER QUANTITY AFTER 1ST DELIVERY ORDER: 50 EA MAXIMUM ORDER QUANTITY AFTER 1ST DELIVERY ORDER: MAX CONTRACT QUANTITY REMAINING NSN / Part Number: 4810-00-325-0646FG (PN: 135675 and/or 10-30326-2) AND/OR NSN / Part Number 4810-00-087-5175FG (PN: AV16B1632A1) OEM for PN 135675 : Whittaker (Cage: 79318) OEM for PN AV16B1632A1: ITT Technology (Cage: 73760) DESCRIPTION FOR PART NUMBER 135675 Noun: Motor Operated Gate Valve Applicable to: B52 & KC135 Aircraft Description: NSN item is main firewall shutoff valve. It supplies fuel to the engine. Item is a critical component and failure would force a mission abort. Approx Dimensions: 6.33? x 6.63? x 3.27? Weight: 2.38 lbs Material Content: Aluminum Alloy Destination: TBD Applicable Technical Order(s): 6J15-10-66-363 (latest revision - 1 change, 15 JUL 2005), AND T.O. 8D1-14-77-343 (latest revision - 2 change, 1 FEB 2006) DESCRIPTION FOR PART NUMBER AV16B1632A1 Noun: Motor Operated Gate Valve Applicable to: B52 & KC135 Aircraft Description: NSN item is main firewall shutoff valve. It supplies fuel to the engine. Item is a critical component and failure would force a mission abort. Approx Dimensions: 6.33? x 6.63? x 3.27? Weight: 2.38 lbs Material Content: Aluminum Alloy Destination: TBD Applicable Technical Order(s): 6J15-10-159-3 (latest revision - 2 change, 1 DEC 2005), T.O. 8D1-14-128-3 (latest version ? 15 APR 2001), AND T.O. 8D1-14-129-3 (latest revision - 1 change, 1 FEB 2006) GFM and CAP are NOT authorized. All materials and support equipment will be furnished (CFM). DELIVERY SCHEDULE: Delivery schedule to be 92 EA, 30-Days ARO until completion of Order. If a delivery order is placed with less than 92 EA, that quantity will be required to be delivered within 30-Days ARO. The contractor shall begin production even if all reparable quantities on the delivery orders have not been received. INITIAL PRODUCTION EVALUATION (IPE) *An IPE (Initial Production Evaluation) will be required on all new sources, as well as sources who have not performed the overhaul in the previous 60 months. The contractor will have 30 days to prepare for the IPE. Upon Government IPE acceptance, the contractor will have another 30 days to begin production, on the first delivery order only, in accordance with the Delivery Schedule. (If an IPE is not required, the contractor will have 30 days ARO and repairables to begin production IAW the delivery schedule.) ROB BACK The contractor is authorized to ?Rob-back? subassemblies or parts for installation on another end item to meet delivery requirements. MISCELLANEOUS All serviceables will be shipped from the contractor to the user by utilizing fast transportation methods. Shipping instructions will be provided to the contractor by phone, fax, e-mail, or other electronic means via the Production Manager. A copy of all electronic Wide Area Work Flow (WAWF) DD-250?s will be sent to the PMS within 2 days of shipment. A Quarterly Production Management Review (PMRT) meeting will be required. At least the first PMRT will be held at the contractor?s facility. Subsequent PMRT?s will be held either by telephone or at the contractor?s facility, depending on the statuor’s facility. The Contractor shall act as the CRI to store reparable items shipped directly from designated Field Units, an Air Logistics Center (ALC) or from another Contractor’s facility. (b) The Consolidated Reparable Inventory Level is hereby established as a range of the aggregate total quantity of all ELINs, with an upper limit of the listed yearly quantities for each and a lower limit of 0 (“zero”) each. Disposition instructions for items in excess of the maximum level shall be provided by the PMS or Contracting Officer. (c) Induction of an item for overhaul from the CRI shall be contingent on the availability of reps in the CRI in conjunction with the early induction provision, which allows the contractor to induct at their own risk. (d) Upon completion of the contract, disposition instructions for items remaining in the CRI shall be provided by the Contracting Officer. CONSOLIDATED SERVICEABLE INVENTORY (CSI) (a) This overhaul effort requires the establishment of a Consolidated Serviceable Inventory (CSI) at the Contractor’s facility. The contractor shall store completed serviceable items and ship them directly to a designated user at a Field Unit, Air Logistics Center (ALC), or other Contractor facility based upon a prioritized demand. (b) The CSI of end items shall begin when the overhaul of an item is completed and the item has been inspected and accepted. For each completed overhaul (unless other shipment instructions have been provided) a WAWF electronic DD Form 250 shall be signed off and the item(s) shall be shipped in place to the Contractor’s Consolidated Serviceable Inventory c/o the Secure Air Force Government Bond Room at the Contractor’s Facility. (c) The Consolidated Serviceable Inventory Level is hereby established as a range of the aggregate total quantity of all ELINs, with an upper limit of the yearly quantities listed on Appendix “A” Exhibits for each ELIN, and a lower limit of 0 (“zero”) each. Notwithstanding the CSI level, induction of an item for overhaul will be contingent on the availability of a funded order, a reparable, and a negotiated delivery schedule. (d) At the end of the contract ordering period, the government commits to issuing a “Final Reconciliation Delivery Order” to buy back the overhauled valves remaining in the CSI when the ordering period expires. (This ordering period shall include the option periods, if exercised.) Since a reconciliation of excess quantities projected by the government (but not actually ordered) will be a continual process covered during the quarterly reviews, the quantity to be purchased by the government at the end of the contract shall be limited to the quantity projected by the government during the 12 months preceeding the end of the ordering period (for all other orders). The contractor will be requested to provide information on the total quantity remaining in the CSI. The government will compare this data to it’s own documentation. Any disagreement that results will either be negotiated or handled under the “Disputes Clause”, at the government’s option. The quantities on the final reconciliation order shall be deemed as a governmental bona fide need. The final reconciliation delivery order will require the contractor’s input within 10 (ten) calendar days after expiration of the ordering period (for all other orders). The contractor shall provide the final count of the total quantity remaining in the CSI that fell within the government’s projections during the preceeding 6 month period of performance. The final reconciliation delivery order will be issued thereafter and shall be the only delivery order issued after expiration of the ordering period (for all other orders). This process is expected to be complete 60 days after receipt of the final count from the contractor. Delivery of the units ordered by the final reconciliation order shall be required within 30 days after receipt of the delivery order unless other terms are negotiated and so stated in the delivery order. DELIVERY SCHEDULE: *High Priority Delivery Schedule will be effective 90 days after effective date of contract. High Priority Reparables: 2 days after receipt of order up to the quarterly overhaul projections. The contractor shall begin production even if all reparable quantities on the delivery orders have not been received. Low Priority Reparables: Request the delivery schedule to be 92 EA, 30 days from either ELIN, or a combination of both ELINs, after receipt of order until completion of order. The contractor shall begin production even if all reparable quantities on the delivery orders have not been received. *Quantities that exceed the aggregate quarterly overhaul induction projections during the 3 month period after the government submission of the quarterly overhaul induction projections will require a 45 day delivery schedule. INITIAL PRODUCTION EVALUATION (IPE) *An IPE (Initial Production Evaluation) will be required on all new sources, as well as sources who have not performed the overhaul in the previous 60 months. The contractor will have 30 days to prepare for the IPE. (If an IPE is not required, the contractor will have 30 days to begin production in accordance with the Low Priority Reparables Delivery Schedule.) The reparables used in the IPE will be applied to the quantity from the first delivery order. Upon Government IPE acceptance, the contractor will have another 30 days to begin production, on the first delivery order only, in accordance with the Low Priority Reparables Delivery Schedule. ROB BACK The contractor is authorized to “Rob-back” subassemblies or parts for installation on another end item to meet delivery requirements. MISCELLANEOUS All serviceables will be shipped from the contractor to the user by utilizing fast transportation methods. Shipping instructions will be provided to the contractor by phone, fax, e-mail, or other electronic means via the Production Manager. A copy of all electronic Wide Area Work Flow (WAWF) DD-250’s will be sent to the PMS within 2 days of shipment. A Quarterly Production Management Review (PMRT) will be required at the contractors facility. The Government requests that this be not separately priced and included in the quoted prices for the actual overhaul services. A Preaward Survey is required if the apparent successful offer is not a previously proven overhaul service supplier for both NSN’s. Under the authority of FAR 6.302, the proposed contract action is for supplies/services for which the Government intends to solicit and negotiate with only one, or a limited number of sources. Interested parties may identify their interest and capability to respond to the requirement or submit proposals. This notice of intent is not a request for competitive proposals. However, all proposals received within 30 days after date of publication of this synopsis will be considered by the Government. A determination by the Government not to compete this proposed contract based upon responses to this notice is solely within the discretion of the Government. Information received will normally be considered solely for the purpose of determining whether to conduct a competitive procurement. Award will be made only if the offeror, the product/service, or the manufacturer meets qualification requirements at the time of award in accordance with FAR clause 52.209-1. The solicitation will identify the office where additional information can be obtained concerning qualification requirements as cited in each individual solicitation. It is suggested that small business firms or others interested in subcontracting opportunities in connection with the described procurement make contact with the firm(s) listed. Based on market research, the Government is not using the policies contained in FAR Part 12 (Acquisition of Commercial Items) in the planned so NOTE: THIS NOTICE MAY HAVE POSTED ON FEDBIZOPPS ON THE DATE INDICATED IN THE NOTICE ITSELF (03-AUG-2006). IT ACTUALLY APPEARED OR REAPPEARED ON THE FEDBIZOPPS SYSTEM ON 16-OCT-2006, BUT REAPPEARED IN THE FTP FEED FOR THIS POSTING DATE. PLEASE CONTACT fbo.support@gsa.gov REGARDING THIS ISSUE.
- Web Link
-
Link to FedBizOpps document.
(http://www.fbo.gov/spg/USAF/AFMC/OCALCCC/FA8103-06-R-0420/listing.html)
- Place of Performance
- Address: TO BE DETERMINED
- Record
- SN01166361-F 20061018/061016221832 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |