Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF OCTOBER 21, 2006 FBO #1790
SOURCES SOUGHT

16 -- Extend production kit modification options for the C-5 Avionics Modernization Program (AMP)

Notice Date
10/19/2006
 
Notice Type
Sources Sought
 
NAICS
336411 — Aircraft Manufacturing
 
Contracting Office
2590 Loop Road Wright Patterson AFB, OH
 
ZIP Code
00000
 
Solicitation Number
PIXS5058
 
Response Due
10/30/2006
 
Archive Date
11/30/2006
 
Small Business Set-Aside
N/A
 
Description
The 716 AESG, Wright-Patterson Air Force Base, OH contemplates the award of sole source contract actions to extend production kit modification options for the C-5 Avionics Modernization Program (AMP). Lockheed-Martin Corporation was awarded the C-5 AMP Engineering, Manufacturing, and Development contract under full and open, best value source selection in 1999. The contract included competitively priced production options for AMP kits, spares, and installation for up to 124 aircraft. Budget adjustments and program delays have forced the need to restructure the options for production for up to 53 operational C-5 A/B/C aircraft. The first of these kits/spares are anticipated to be awarded in December 07 and the option for the associated installation is anticipated to be exercised in December 08. Lockheed-Martin Corp is the only source possessing the technical and engineering expertise to continue the production of C-5 AMP, maintaining total schedule, configuration, and system performance responsibility of the re-phased acquisition. Sole source negotiation for restructure of options for kits and spares for C-5 AMP production is envisioned pursuant to the authority of 10 USC 2304(c)(1), as implemented under FAR 6.302-1(a)(2). The USAF cannot provide sufficient drawings, data, etc to facilitate award of kits and spares to another source. Sole source negotiation for restructure of options for installation for C-5 AMP production is envisioned pursuant to the authority of 10 USC 2304(c)(1), as implemented by FAR 6.302-1(a)(2)(ii). TCTO 714 and Level 3 wire harness installation drawings are available. The 716 AESG, however, believes that award of installation to another source would result in substantial duplication of cost that the Government would not recover through competition and would result in unacceptable delays in fulfilling USAF requirements. Lockheed-Martin, at the start of the up to 53 installations covered by this action, will have completed 59 to 60 installations at Dover and Travis Air Force Bases. The 716 AESG does not plan to issue a formal Request for Proposal. Interested sources, however, are invited to submit capability statements for consideration. Such statements shall be submitted with 10 days of this publication to 716 AESG/PK, Building 558, 2590 Loop Road West, Wright-Patterson AFB, OH 45433-7142 to the attention of Ms. Vicki Diaz, Contracting Officer or Victoria.diaz@wpafb.af.mil. Questions may be addressed to Ms. Diaz at (937) 255-0748. Current status is pre-solicitation. This is Category 16 ? aircraft components and accessories program. For more information on "Extend production kit modification options for the C-5 Avionics Modernization Program (AMP)", please refer to: https://www.pixs.wpafb.af.mil/pixs_solicitation.asp?id=5058
 
Web Link
Extend production kit modification options for the C-5 Avionics Modernization Program (AMP)
(https://www.pixs.wpafb.af.mil/pixs_solicitation.asp?id=5058)
 
Record
SN01167943-W 20061021/061019225023 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.