Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF JANUARY 06, 2007 FBO #1867
SOURCES SOUGHT

16 -- 16-Data Transfer Unit

Notice Date
1/4/2007
 
Notice Type
Sources Sought
 
NAICS
336413 — Other Aircraft Parts and Auxiliary Equipment Manufacturing
 
Contracting Office
Other Defense Agencies, U.S. Special Operations Command, Technical Applications Contracting Office (TAKO), ATTN: AMSAM-TASO-K Lee Boulevard, Building 401, Fort Eustis, VA, 23604-5577, UNITED STATES
 
ZIP Code
00000
 
Solicitation Number
Reference-Number-H92241-07-RFI-0001
 
Response Due
1/18/2007
 
Archive Date
2/2/2007
 
Description
The U.S. Special Operations Command, Technology Applications Contracting Office (TAKO), ATTN: AMSAT-D-TK, Lee Boulevard, Building 401, Fort Eustis, VA, 23604-5577 issues this Request for Information (RFI) regarding the top-level functional and operational capabilities, performance, and design for an avionics grade data receptacle product that provides an intelligent microprocessor-based unit that permits data transfer by providing sockets for some form of portable, securable storage media, and can communicate via dual independent 10/100BaseT Ethernet ports. 1. Background During development of the Common Avionics Architect System (CAAS) for 160th Special Operations Aviation Regiment (Airborne) (SOAR (A)) helicopter fleet it has been discovered that the current data loader device does not have the required throughput to support the loading of mission specific data in a timely manner. An example is the Embedded Digital Map (EDMG), which allows the addition of outside reference data, referred to as GEO Chips, (such as digital pictures, JPEG files, etc.) to be associated with a specific target. These files cannot be stored in persistent memory as they may be classified. The current data loader cannot transfer these files in a timely manner. The current data loader utilizes PCMCIA memory cards to store mission data. This data is transferred via the MIL-STD-1553B data bus to the mission processor. The maximum transfer speed is 1 MB/sec. Each GEO chip is anticipated to be in excess of 2 MB. The current data loader is limited to maximum of 1 megabit/sec transfer rate (a 16 megabyte file will take a minimum of 128 seconds to transfer). TAKO is looking for a product with technical capability to provide a faster data transfer rate, increased memory storage capacity, storage of classified data that can be rapidly zeroized, with minimal impact to current physical installation. 2. Operations Concept The envisioned new data loader should be able to utilize the latest avionics grade secure storage media technology to store the mission data and be able to transfer that data to the CAAS Ethernet Avionics System LAN that transfers the data to the on board mission processors. There are significant technical issues involved, including but not limited to: maximum transfer rates, single vs. multiple line rates (server), in device RAM Cache, single client (sustain) vs. multiple client (peak) read/write potential, maximum transfer rates, in device video/audio recording and playback, secure storage capabilities for storage media (i.e. PCMIA, Compact Flash, USB Memory Sticks, etc). Also, for consideration is the requirement for the lightest and smallest unit possible to limit and/or improve the cube and weight requirements for use on the aircraft. 3. System Requirements 3.1. Four to Six Storage Media Sockets 3.1.1. Slot 1 - DAFIF data (read only to meet uncorruptable database requirement for GATM) Slot 2 - Mission Planning Data (Read/Write)(ACP Lists, Flight Plans, Communication Frequency and COMSEC Presets, etc) Slot 3 - GEO Chip data (Read/Write) (imagery that is linked to a specific geo reference point and can be displayed on the map, i.e. picture of target) Slot 4 - Electronic Order of Battle (Read/Write) (can be updated based upon on-board aircraft sensors) Slot 5 ? Growth Slot 6 ? Growth 4. Ethernet interface 4.1. Supports Ethernet protocols: Hypertext Transfer Protocol (HTTP) Trivial File Transfer Protocol (TFTP) File Transfer Protocol (FTP) Network File Server (NFS) Common Internet File System (CIFS) / Samba /SMB) 5. Weight Requirements: Objective 3 lbs to Threshold 5 lbs. 6. Size Requirements: No larger than: Length 8.5? x Width 5.75? x Height 2.25? 7. Mounting Requirements: Can be mounted via Dzus rail. 8. Zeroization: Fast erase and secure erase capabilities for zeroization via software or discrete commands 9. Growth Capability: Gigabit Ethernet, additional mass storage. 10. Environmental and EMI Qualifications: Must be able to qualify to MIL-STD-461, ADS-37A, and MIL-STD-810F for the majority of the EMI/Environmental considerations. The vibration qualification is based on a combination of several standards to meet the requirements for different aircraft. 11. Product Availability: 6 months ARO 12. Possible Program Dependent on the responses of this RFI, a follow on program may include the following phases: (a) one or more engineering tests and analysis to determine performance characteristics and limitations, (b) a proof-of-concept demonstration in a CAAS SIL (c) a leave-behind operational prototype. However, the government has not decided upon such a program and this RFI does not constitute notice of intent to embark on such a development program. In accordance with FAR 15.202(e), responses to this notice are not offers and cannot be accepted by the Government to form a binding contract. Responders are solely responsible for all expenses associated with responding to this RFI. Only responders who have already developed or have avionics grade data loading devices and demonstrated results are desired. All responses should address the following subjects: (1) company experience in avionics grade data loading devices technology development including programs, sponsors and development roles; (2) test results that are applicable to the technology; (3) company developed equipment which are applicable; (4) the proposed concept including characteristics as related to the requirements section of this document. Any proprietary information submitted will be protected if appropriately marked. All responses (one response per company) are to be provided on company letterhead and limited to fifteen pages. Responses must be submitted to the Government POC identified below. Questions may be sent to ldiedric@tapo.eustis.army.mil. Contacts must be made by email only. All packages submitted electronically or by electronic media shall be free of any computer virus. If a virus is found, the package will be destroyed and a replacement will be requested, which must be provided within three days after notification. Response to this RFI must arrive in this office no later than 4:00 pm (EDST) on 18 January 2007.
 
Record
SN01205457-W 20070106/070104221016 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.