Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF FEBRUARY 07, 2007 FBO #1899
SOLICITATION NOTICE

Z -- Repair Aprons, Phase 2B, Project No. WWCX 05-1036B

Notice Date
2/5/2007
 
Notice Type
Solicitation Notice
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
Department of the Air Force, Air Force Space Command, Detachment 1, 21 CONS, U.S.Embassy PSC 73, APO AE, AE, 09716, UNITED STATES
 
ZIP Code
00000
 
Solicitation Number
FA2523-07-R-0003
 
Point of Contact
Renee Carelli, Contract Administrator, Phone +45 3341 7468, Fax +45 3526 5108,
 
E-Mail Address
renee.carelli@det1.dk
 
Description
The scope of the Repair Aprons, Phase 2B project (Project Number WWCX 05-1036B) requires the contractor to furnish all supervision, plant, labor, materials, tools, and equipment to correct deficient sub-grade drainage and reconstruct sub-grade depressions in airfield aprons at Thule Air Base, Greenland. The work includes but is not limited to leveling the base coarse and replacing deteriorated pavement (approximately 15,200 SY), including painting and markings. The contractor shall be responsible for determining the amount of work needed to fulfill the requirements of the contract specifications and drawings. All quantities listed in the contract documents are estimates only. The awardee will be responsible for determining actual needs. Rock materials shall be mined and milled on-site at Thule Greenland utilizing the awardee?s equipment. The awardee will be responsible for obtaining the necessary shipping and use permits for explosives, etc. required to perform the work. The location of Thule Air Base limits exterior work to the months of June through September, although work is sometimes possible in May or October. Additionally, Thule Air Base's location demands that all supplies/personnel must be shipped/transported in/out via air/sealift. Thule Air Base is not a commercial air/sea port and there is no other access. Shipping schedules are dictated by Defense contracts, and materials and labor are not available locally. The project magnitude is between $1,000,000 and $5,000,000. The performance period for this project shall be approximately 2 years from issuance of the Notice to Proceed (NTP). Price-Performance Tradeoff (PPT) shall be used as the method of evaluation. Price will be evaluated equally with Past Performance. A more favorable past performance rating may result in award to other than the lowest priced offeror, based on the evaluation criteria established in the solicitation. It is anticipated the solicitation documents, including specifications and drawings, shall be posted electronically on or about 23 February 2007 with offers due 30 days thereafter. Any and all amendments shall be likewise posted. This solicitation and award is restricted in accordance with 10 U.S.C. 2304(c)(4) International Agreement, to US, Danish and Greenlandic firms. No hard-copies of the solicitation will be distributed. Offerors are required to be registered in the Central Contractor Registry (see www.ccr.gov). Point of Contact: Renee Carelli, Contract Administrator, Phone +45 33 41 74 68, Fax +45 35 26 51 08, Email renee.carelli@det1.dk ? Kenneth E. Mackay, Contracting Officer, Phone +45 33 41 74 67, Fax +45 35 26 51 08, Email: kenneth.mackay@det1.dk
 
Place of Performance
Address: Thule Air Base
Country: GREENLAND
 
Record
SN01225940-W 20070207/070205222652 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.