MODIFICATION
58 -- Furnish and Install Audio/Visual and Teleconference System at DDOO
- Notice Date
- 2/8/2007
- Notice Type
- Modification
- NAICS
- 334310
— Audio and Video Equipment Manufacturing
- Contracting Office
- Defense Logistics Agency, Logistics Operations, Defense Distribution Center, 2001 Mission Drive DDC CSS-AB, Bldg 404, New Cumberland, PA, 17070-5001, UNITED STATES
- ZIP Code
- 17070-5001
- Solicitation Number
- SP3100-6339-3021
- Response Due
- 2/20/2007
- Archive Date
- 3/7/2007
- Point of Contact
- DANIEL HERRING, CONTRACT SPECIALIST, Phone 717-770-6030, Fax 717-770-5689,
- E-Mail Address
-
daniel.herring@dla.mil
- Small Business Set-Aside
- Total Small Business
- Description
- DDC has received additional contractor questions in response to the Revised Scope of Work that was posted to FedBizOpps via Amendment No. 2 dated January 31, 2007. The questions and answers are provided below. The answers to these questions are considered to be clarifications to the Revised Scope of Work only; these answers do not represent changes that require another revision to the SOW. Therefore, contractors are requested to provide quotes in response to the Combined Synopsis/Solicitation and Scope of Work posted by Amendment No. 2 on 01/31/07. The closing date for this solicitation remains February 20, 2007. 1. Source equipment: Do you want a) 1 DVD-R/VHS Combo or b) 2 separate units of 1 DVD-R and 1 VHS/VHS dual deck? A dual deck VHS is almost non existent. A ? We require a single unit that has both DVD-R and VHS capabilities. 2. a) It is stated that the contractor will not be required to make modifications to the room, yet it is written in the solicitation that the contractor is to remove the existing rear projector screen and install the new screen. Is it truly the intent for the contractor to modify the screen opening and install the new screen? A ? The revised SOW states ?contractor to remove existing 6? x 12? rear projection framed glass screen, and install new 6? x 12? rear projection framed glass screen?. Since the screen size is the same, it will not require any modifications to the room or frame. b) The first SOW specified replacing the existing 6' x 12' screen with a 6' x 8' screen. Now a 6' x 12' has been requested. Is this correct? A - Yes, a 6? x 12? screen is required. The SOW was revised, the first SOW no longer applies. c) Will the contractor be expected to supply a new work surface for the lectern? A ? Yes. 3. Requested Touch Panels are to display video. Is that: a. Composite Video (DVD, Tuner etc) b. Computer Video c. Both Composite and computer video A ? Touch panels will display control system information (lighting controls, audio controls, video input controls, computer, DVD and video conference controls). 4. Item 5 that outlines microphone and speaker coverage for the entire conference room. Do you require that the ceiling microphones reinforce the audio back into the ceiling speakers at all times, or is the intent for only the ceiling microphones be used for only video conferencing where room audio is not present in the ceiling microphones? A ? The intent is to reinforce the audio back into the ceiling speakers at all times. NOTE: THIS NOTICE WAS NOT POSTED TO FEDBIZOPPS ON THE DATE INDICATED IN THE NOTICE ITSELF (08-FEB-2007); HOWEVER, IT DID APPEAR IN THE FEDBIZOPPS FTP FEED ON THIS DATE. PLEASE CONTACT fbo.support@gsa.gov REGARDING THIS ISSUE.
- Web Link
-
Link to FedBizOpps document.
(http://www.fbo.gov/spg/DLA/J3/DDC/SP3100-6339-3021/listing.html)
- Place of Performance
- Address: Tinker AFB, OK
- Zip Code: 73145-8000
- Country: UNITED STATES
- Zip Code: 73145-8000
- Record
- SN01229110-F 20070210/070208230535 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |