MODIFICATION
C -- Design Excellence Solicitation for Lead Design Architect/Engineer for the Minton-Capehart Federal Building, Indianapolis, IN
- Notice Date
- 12/30/2005
- Notice Type
- Modification
- NAICS
- 541310
— Architectural Services
- Contracting Office
- General Services Administration, Public Buildings Service (PBS), Office of Property Development, Rm 3512 (5PE), 230 South Dearborn Street, Room 3512, Chicago, IL, 60604
- ZIP Code
- 60604
- Solicitation Number
- GS05P06GBC0001
- Response Due
- 1/31/2006
- Point of Contact
- Bobbie Tyler, Contracting Officer, Phone (312)886-7875, Fax (312)886-4103, - Bobbie Tyler, Contracting Officer, Phone (312)886-7875, Fax (312)886-4103,
- E-Mail Address
-
bobbie.tyler@gsa.gov, bobbie.tyler@gsa.gov
- Description
- Minton-Capehart Federal Building Walk-Thru 01/26/06 Question and Answers Question The demountable partition system will be unstable when the ceiling system is removed, this is necessitated by the construction outlined in items 2, 4, 7 and 9. Therefore, is GSA planning to remove and reinstall the partitions or will they be protected and laterally braced during the construction phase? Answer GSA will not be doing anything to support, nor will we be removing and replacing wall systems. That must be considered a design element and the construction contractor will be required to take this issue into consideration. Question If the new lighting and mechanical system change the plenum height then will the scope of work include the selection and specification of a new demountable partition system? Answer GSA is not changing any wall systems under this project. Question Are there any hazardous materials in the building? Answer Based upon the PDS report the following is noted: The work on this site will require the various materials be properly handled. These include fluids associated with removing the existing generator (i.e. diesel fuel, antifreeze, battery acid and oil), fluorescent lamps (mercury) and old magnetic ballasts (possible PCBs). The only known asbestos in the building is in the floor tiles in the Ground Floor and in the Second Floor elevator lobby. This project should not disturb those tiles and no asbestos abatement is contemplated. Question Will the roof top work, items 1 and 3 necessitate removal and replacement of the roof membrane? If so, will this work be done under this project or a separate project? Of the roof is replaced will a green roof would be required to improve the roof performance and reduce energy consumption? Answer No, the roof is currently being solicited for replacement with a September 06 finish date under a separate contract. It is anticipated that there will be a newly installed roof at the time this project begins. Question Will the building exterior glass be replaced under a separate contract to improve it performance and reduce energy consumption? Answer No Question The central toilet rooms are accessible. Will all toilet rooms be modified as part of this work? Answer If the rest-rooms are required to have sprinkler devices, then all rest-rooms will be included in the project. Ventilation will be a part of the design as well. Question Will the day care system upgrades the performed in two phases to allow the daycare to remain on the first floor, in operation during construction? Answer Phasing issues to be determined during design. Question What is the projected construction cost of the scope of construction items 1 through 9? Answer Refer to the synopsis/amendment Question Will the elevators and stairs be renovated as part of prime objective number 3? Answer Work in the stairs with reference to the existing standpipes/installation of the sprinkler system is part of the project. Question What is the square footage of the building? Answer 636,434 GSF Question Is the parking structure included in the gross square feet provided in the project announcement? Answer No Question Who did the Program Development Study for this project? When was it completed? Answer Architura, February 2004 Question For our firm and designer portfolios, can we include projects where the design is complete, but not yet fully constructed? Answer GSA cannot direct firms on what or how to address the Request for Qualifications (RFQ) Question For the section entitled Philosophy and Design Intent, is the two page maximum for both Lead Engineer and Lead Designer combined, or can the Lead Engineer and Lead Designer each write a two pages a piece? Answer GSA cannot direct firms on what or how to address the Request for Qualifications (RFQ) Question What happens if NOTE: THIS NOTICE MAY HAVE POSTED ON FEDBIZOPPS ON THE DATE INDICATED IN THE NOTICE ITSELF (30-DEC-2005). IT ACTUALLY APPEARED OR REAPPEARED ON THE FEDBIZOPPS SYSTEM ON 09-FEB-2007, BUT REAPPEARED IN THE FTP FEED FOR THIS POSTING DATE. PLEASE CONTACT fbo.support@gsa.gov REGARDING THIS ISSUE.
- Web Link
-
Link to FedBizOpps document.
(http://www.fbo.gov/spg/GSA/PBS/5PCI/GS05P06GBC0001/listing.html)
- Place of Performance
- Address: 575 North Pennsylvania Street Indianapolis, IN
- Zip Code: 46204
- Country: US
- Zip Code: 46204
- Record
- SN01229922-F 20070211/070209224025 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |