Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF MARCH 29, 2007 FBO #1949
SOURCES SOUGHT

Y -- B71 UPGRADE RM. 146 INFRASTRUCTURE FOR LASER LAB

Notice Date
3/27/2007
 
Notice Type
Sources Sought
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
Department of Energy, Lawrence Berkeley National Laboratory (DOE Contractor), Lawrence Berkeley, 1 Cyclotron Road MS: 937-200, Berkeley, CA, 94720, UNITED STATES
 
ZIP Code
00000
 
Solicitation Number
922
 
Response Due
4/13/2007
 
Archive Date
4/28/2007
 
Description
ADVERTISEMENT FOR PREQUALIFICATION Subject to conditions prescribed by the University of California, Lawrence Berkeley National Laboratory, responses to the University's prequalification documents for a Lump Sum construction Subcontract are sought for the following project: B71 UPGRADE RM. 146 INFRASTRUCTURE FOR LASER LAB Project RFP Number 922 To be performed at Ernest Orlando Lawrence Berkeley National Laboratory One Cyclotron Road Berkeley, CA 94720 Prequalification of Prospective Bidders: The University has determined that bidders who submit bids on this project must be prequalified. Prequalified bidders will be required to have a valid California contractor's license appropriate for the type of work involved. General Description of Work: Provide all labor, material, tools and equipment to complete all work as described in the plans and specifications. The scope of work includes: The Building 71 Upgrade Rm. 146 Infrastructure for Laser Lab Project will upgrade areas within LBNL Building 71 including the creation of a new 36-inch thick concrete shielding enclosure inside of an existing building to accommodate two new beamlines, to enable the installation of equipment used by the LOASIS (Laser Optics and Accelerator Systems Integrated Studies) Program in order to conduct high-energy physics experiments. The project will include the installation of a new AHU unit, the replacement of an existing cooling tower and chiller, and associated electrical, mechanical, plumbing and architectural upgrades. Estimated Price Range and Construction Period: The estimated price range for this project is between $1.2M and $1.5M. The construction period is up to 135 calendar days. Procedures: Prequalification documents will be available and posted on the LBNL Facilities & Construction WEB page http://fac.lbl.gov/Facilities/DandC/bidinfo/index.php on March 30, 2007. Responses to the pre-qualification documents are due April 13, 2007 For information contact: John Tennyson (510) 486-5255
 
Place of Performance
Address: Ernest Orlando Lawrence Berkeley National Laboratory, One Cyclotron Road, Berkeley, CA 94720
Zip Code: 94720
Country: UNITED STATES
 
Record
SN01259758-W 20070329/070327220257 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.