Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF APRIL 19, 2007 FBO #1970
SOLICITATION NOTICE

Y -- Correct Ventilation in BSL-3 for VAMHCSVA Baltimore Medical Center

Notice Date
4/17/2007
 
Notice Type
Solicitation Notice
 
NAICS
423390 — Other Construction Material Merchant Wholesalers
 
Contracting Office
Department of Veterans Affairs;VAMC;10 N Greene St;Baltimore MD 21201
 
ZIP Code
21201
 
Solicitation Number
VA-245-07-RP-0001
 
Archive Date
5/2/2007
 
Small Business Set-Aside
Service-Disabled Veteran-Owned
 
Description
Provide all supervision, labor, materials, equipment, and connections for Project 512-02-104; "CORRECT VENTILATION IN BSL-3" (Biological Safety Level-3) and Cage Washing areas at Research Service Animal Laboratory Facility in Quadrant "B" on Basement Floor, and upward to Seventh Floor roof, all at V.A. Medical Center, Baltimore, MD, 21201, which shall remain a functioning Hospital Building, and Animal Research Facility throughout duration of Contract Construction work, which shall include but not be limited to: sealed gypsum board dust barriers; low noise level demolition of masonry walls, trowelled-on flooring, and various equipment installations (no loud automatic hammering, sawing, or drilling in or above Animal Facility); all works within Animal Facility and Interstitial Space above same shall be completed while wearing substantial protective clothing supplied by V.A.; new masonry walls, trowelled-on flooring, door frames, doors, door hardware, painting, new "Beta Star" Sterilizer installation, steam piping, plumbing, HVAC ductworks and piping, extensive electrical works; Main Exhaust Duct completely sealed by Seamless, all Welded Stainless Steel Construction running from Animal Facility, across Interstitial Space above, then upward through 8-each 18-foot high Mechanical / Electrical "Service Bays" crowded with existing piping and ductworks, through several Stainless Steel offsetting transition ducts, and out onto Seventh Floor roof , into two new Exhaust Fans; with concrete floor slab cutouts, surrounded by concrete "housekeeping" curbs supported by new Structural Steel members painted and coated with spray-on fireproofing at each floor and roof, with other related mechanical, electrical, and control works, all to be in accordance with Contract Drawings and Specifications. Proposed Contract Construction Works have been divided into three (3) distinctly separate Phases, wherein each Phase shall be separately worked to completion before starting next Phase.
 
Record
SN01274886-W 20070419/070417220513 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.