Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF MAY 16, 2007 FBO #1997
SOURCES SOUGHT

Z -- Repair 2nd Floor Fire Suppression/HVAC ? PH II ABW HQ. This project renovates the interior and installs fire suppression that doesn?t currently exist.

Notice Date
5/14/2007
 
Notice Type
Sources Sought
 
NAICS
238220 — Plumbing, Heating, and Air-Conditioning Contractors
 
Contracting Office
1940 Allbrook Drive Suite 3 Wright-Patterson AFB, OH
 
ZIP Code
00000
 
Solicitation Number
FA8601-07-050033B
 
Response Due
5/20/2007
 
Archive Date
10/1/2007
 
Point of Contact
David Diercks , 937-522-4640
 
E-Mail Address
Email your questions to david.diercks@wpafb.af.mil;timothy.huling@wpafb.af.mil
(david.diercks@wpafb.af.mil;timothy.huling@wpafb.af.mil)
 
Small Business Set-Aside
N/A
 
Description
The Air Force is seeking sources for a potential 100 percent set-aside for HUBZone, or Service Disabled Veteran Owned Small Business (SDVOSB) concerns. IF ADEQUATE RESPONSES ARE NOT RECEIVED, THE ACQUISITION MAY BE SOLICITED ON AN UNRESTRICTED BASIS. This is a sources sought for planning purposes only. TITLE /DESCRIPTION: Rpr 2nd Floor Fire Suppression/HVAC ? PH II ABW HQ, Project Number ZHTV 050033B. This project renovates the interior and installs fire suppression that doesn?t currently exist. It includes complete replacement of the HVAC and electrical systems. The fire alarm is so outdated it cannot be repaired and requires replacement. The requirement for fire suppression/detection carries an FSD 3. The renovation will correct life safety deficiencies such as a conference room with inadequate egress. The project will reconfigure spaces to provide a more efficient use of space. DOLLAR VALUE: $1,000,000 to $5,000,000 SPECIAL REQUIREMENTS/CONCERNS: No fire suppression currently exists and fire alarms are unreliable. Work is necessary to bring the Wing Headquarters building into compliance with Life Safety Code, Handicapped Access and to reconfigure spaces to provide a more efficient use of space. HVAC and electrical systems require revitalization due to age and addition of ADP equipment. HVAC has failed on several occasions requiring temporary heaters and A/C to be brought in until repairs could be made. The system has been repaired several times but is not expected to be reliable in the future. The mechanical system will remain in operation to serve the first floor. The first floor will remain occupied by the Wing Command Section and ASC/JA during construction. This will require the contractor to provide temporary rigging for the demolition and material delivery. All first floor accesses will have to be maintained during the construction. There will be numerous occasions where the contractor will need to stop performing work to accommodate special events and distinguished visitors. PERFORMANCE PERIOD: 365 Days Prime contractors who are HUBZone and/or SDVOSB and who intend to submit a bid for this solicitation MUST submit the following by 2:00 p.m. (local Dayton time) on 20 May 2007: (1) a positive statement of your intention to submit a bid for this solicitation as a Prime Contractor; (2) date of HUBZone and/or SDVOSB certification; (3) listing of experience in work similar in type and scope that you identified to include contract numbers, project titles, dollar amounts, and points of contact with their current phone numbers; (4) evidence of capability to be bonded for bid, performance and payment bonds; and (5) if you are a HUBZone considering a joint venture, you will need to provide proof that this consideration has been forwarded to the cognizant SBA office for approval. Firms interested should provide the above documentation, e-mail and faxed responses will be accepted. All of the above must be submitted in sufficient detail for a decision to be made on the availability of interested HUBZone or SDVOSB concerns. Responses shall be limited to 5 pages. Failure to submit all information requested would result in a contractor being considered 'not interested' in this requirement. The mailing address for responses is 88 CONS/PKC, 1940 Allbrook Dr, Ste 3, Wright-Patterson AFB, OH 45433-5309. For more information on "Repair 2nd Floor Fire Suppression/HVAC ? PH II ABW HQ. This project renovates the interior and installs fire suppression that doesn?t currently exist.", please refer to: https://www.pixs.wpafb.af.mil/pixs_solicitation.asp?id=5242
 
Web Link
Repair 2nd Floor Fire Suppression/HVAC ? PH II ABW HQ. This project renovates the interior and
(https://www.pixs.wpafb.af.mil/pixs_solicitation.asp?id=5242)
 
Place of Performance
Address: Wright-Patterson AFB, OH
Zip Code: 45433
Country: USA
 
Record
SN01294043-W 20070516/070514220512 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.