Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF JUNE 02, 2007 FBO #2014
MODIFICATION

Y -- CA PFH 116-1(1), Trinity Mountain Road, Shasta-Trinity National Forest, Trinity County, California

Notice Date
5/31/2007
 
Notice Type
Modification
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
Department of Transportation, Federal Highway Administration (FHWA), Central Federal Lands Highway Division, 12300 West Dakota Avenue, Lakewood, CO, 80228, UNITED STATES
 
ZIP Code
00000
 
Solicitation Number
DTFH68-07-B-00012
 
Response Due
7/10/2007
 
Archive Date
9/10/2007
 
Description
THE DETERMINATION HAS BEEN MADE TO ADVERTISE THIS PROJECT AS FULL AND OPEN COMPETITION. PROJECT DETAILS: This project will consist of asphalt surfacing and shoulder and culvert rehabilitation on 8.000 kilometers of roadway for CA PFH 116-1(1), Trinity Mountain Road, Shasta-Trinity National Forest, Trinity Country, California. Estimated price range is between $5,000,000 and $8,000,000. This project contains one schedule. Principal work items include: 8 km of slope, reference, clearing and grubbing stake; 16 km of survey and staking (grade finishing stakes); lump sum contractor testing; 3,940 m of silt fence for soil erosion control; 3,960 m3 of roadway excavation; 4,860 m3 of subexcavation; 4,860 m3 of select borrow; 440 m3 of placed riprap (class 2 and 3); 15,370 metric tons of aggregate base; 4,000 m of ditch reconditioning; 57,120 m2 of roadway reconditioning; 13,720 metric tons of hot asphalt concrete pavement, Hveem test, class B, grading C or E; 90 l of prime coat, grades CSS-1, CSS-1h, SS-1, or SS-1h; 271 m of pipe culvert (various size); 80 m of steel bridge railing; 1,785 m of standard underdrain system; 2,700 m2 of asphalt paved ditch; 32.000 km of pavement markings for temporary traffic control; 1,300 hours of flagger for temporary traffic control; along with associated removal of trees, catch basins, pipe culvert, and signs; roadway aggregate; antistrip additive; fog seal; pipe culvert end sections; rental equipment; and labor. Tentative advertisement date is June 6, 2007. PLEASE NOTE: The Invitation for Bid will be available for download after June 6, 2007, from the Federal Business Opportunities (FBO) website at www.fedbizopps.gov. PLANS WILL BE AVAILABLE FOR DOWNLOAD IN ADOBE (.pdf) FORMAT ONLY ON CFLHD's WEBSITE at http://www.cflhd.gov/procurement/construction/advertised-projects.cfm under the Project Name. In order to view the plans, interested vendors must register through the CFL website. Other information regarding this solicitation is also available at the above website. If you have problems accessing information on the website, please call (720) 963-3353 or (720) 963-3355. Technical questions specific to the project will only be addressed by FHWA via written correspondence to e-mail address CFLContracts@fhwa.dot.gov or FAX to (720) 963-3360.
 
Place of Performance
Address: Shasta Trinity National Forest, 3644 Avtech Parkway, Redding, CA
Zip Code: 96002
Country: UNITED STATES
 
Record
SN01306325-W 20070602/070531220649 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.