Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF JUNE 27, 2007 FBO #2039
SOLICITATION NOTICE

Y -- CONSTRUCT RECREATION COMPLEX GALENA CREEK REGIONAL PARK

Notice Date
6/25/2007
 
Notice Type
Solicitation Notice
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
Department of Agriculture, Forest Service, R-4 SW Idaho/Nevada Acquisition Office, 1249 S. Vinnell Way, Suite 200, Boise, ID, 83709, UNITED STATES
 
ZIP Code
00000
 
Solicitation Number
AG-9360-S-07-0027
 
Response Due
8/13/2007
 
Description
Project Size Range/Magnitude: $1,000,000 - $5,000,000. Full and Open Competition. Bid/Offer Bond required in the sum of 20% of bid/offer value. Technical/Job Contact: Linda Guy, lguy@fs.fed.us, 775-352-1263 Administrative Contracting Officer: Steve Roehr, sroehr@fs.fed.us, 702-839-5575. Subcontracting Plan required. Solicitation/RFP: To be posted at this site on or after 07/10/2007. Due date for offers will be 30 days from the time of posting. Due date will be adjusted on this advertisement at that time. Site Visit/Pre-bid meeting information not yet available. A Pre-bid visit will be scheduled most likely between July 25 - August 1, 2007. Potential General Contractors, as well as Subcontractors are encouraged to register here at this FBO website using the Interested Vendors Listing feature. This will form a "Bidders List" of sorts that is available publically on the website. This project consists of constructing a Visitor Center (building) with plaza, aggregate surfaced service road, and paved parking area; constructing a trailhead with picnic sites, tie racks, precast vault toilet, pathways, and parking areas (part aggregate surface course, part paved surface); and constructing a double-lane paved access road off of SR431 (Mount Rose Highway). The work includes the installation of utilities (water, sewer, electrical, telephone, & LPGas) to serve the site and construction of a septic system and drain field. The project also consists of optional work items that may or may not be awarded. These items include: Option 1 ? Constructing a 100 PAOT group sites with site furnishings, a precast vault toilet, pathways, signs, gates, barrier rocks, culvert, water service, and aggregate surfaced loop road and parking. Option 2 ? Constructing a second 100 PAOT group site with site furnishings, a precast vault toilet, pathways, and water service. Option 3 ? Furnishing and installing a pre-fabricated shelter for the 100 PAOT group site. Option 4 ? Constructing the entire water system, except the laterals included in Options 1 and 2. The connections to the existing county-owned water system and the new visitor center shall be part of the base bid. If Option 4 is not awarded, the water system will be constructed by the Forest Service. In this case, the contractor will be responsible for coordinating connections and construction with the Forest Service. Option 5 - Construct and install informational signs and hitch rails. Option 6 - Construct and install a kiosk.
 
Place of Performance
Address: PROJECT LOCATION, about 16 miles South of Reno, Nevada. Access is via US 395 (South) for 9 miles then travel 7 miles West on Mount Rose Highway (SR431). The site address is 18350 Mount Rose Highway, Reno, NV,
Zip Code: 89511-5722
Country: UNITED STATES
 
Record
SN01326804-W 20070627/070625220232 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.