Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF JULY 19, 2007 FBO #2061
MODIFICATION

Y -- CONSTRUCT ROADS AND CONNECT UTILITIES FOR FUTURE BUILDING

Notice Date
6/4/2007
 
Notice Type
Modification
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
Department of Agriculture, Forest Service, R-4 SW Idaho/Nevada Acquisition Office, 1249 S. Vinnell Way, Suite 200, Boise, ID, 83709, UNITED STATES
 
ZIP Code
83709
 
Solicitation Number
AG-9360-S-07-0011
 
Response Due
6/12/2007
 
Point of Contact
Steve Roehr, Contracting Officer, Phone 702-839-5575, Fax 702-839-5599, - Charlene Byrd, Procurement Assistant, Phone 702-839-5561, Fax null,
 
E-Mail Address
sroehr@fs.fed.us, cbyrd@fs.fed.us
 
Description
Replacement Synopsis of project incorrectly identified as AG-9360-S-07-0012 previously (Posted April 20, 2007). The correct number should have been AG-9360-S-07-0011 as appears on the face of the RFP document. MARKLEEVILLE-TURTLE ROCK FIRE STATION RELOCATION (PHASE1) This phase of the project includes constructing a two-way (20-foot wide travel way) native sur-face access road and parking area including culvert, and curb stops; installing a road closure gate; relocating two 1,000 gallon fuel storage tanks from the Markleeville Administrative site and placing them on constructed concrete slabs with bollards; installing traffic control signs and entrance signs; installing barrier rocks; installing waterline including valves, drains and associ-ated appurtenances; installing sewer line, dosing tank, septic tank, and drainfield; and installing an electrical distribution system to serve the site. This phase of the project may also include the following optional work that may or may not be awarded (Options May Be Awarded in Any Order): Option #1: 6-inch Aggregate for Base Bid Option #2: 3-inch Asphalt Road Surface for Base Bid Option #3: Gravel Exit Road Option #4: Flammable Storage Building Option #5: Pavilion w/ Path Option #6: 6-inch Aggregate Road Surface for Fire Station Road Option #7: 3-inch Asphalt Road Surface for Fire Station Road Quantities associated with these options are identified in the Schedule of Items under each indi-vidual option. The project is near the Turtle Rock Campground located approximately three miles North of Markleeville, California on Highway 89 in Alpine County. The project magnitude is between $250,000 - $500,000. Solicitation Proposals due to Contracting Officer NLT June 12, 2007 at 1700 hrs Local Time. NO FAX or Electronic submission. An Offer Gurantee, (Bid/Offer Bond), will be required in order for a proposal to be accepted and must accompany the offer. It must be drawn at 20% of offer amount, including any options. To be considered for award, an offerer must possess be actively registered at the Central Contracting Registertration (CCR)website with a valid DUNS number. Registration instructions may be found here: https://www.bpn.gov/ccr/scripts/index.html NOTE: THIS NOTICE MAY HAVE POSTED ON FEDBIZOPPS ON THE DATE INDICATED IN THE NOTICE ITSELF (04-JUN-2007). IT ACTUALLY APPEARED OR REAPPEARED ON THE FEDBIZOPPS SYSTEM ON 17-JUL-2007, BUT REAPPEARED IN THE FTP FEED FOR THIS POSTING DATE. PLEASE CONTACT fbo.support@gsa.gov REGARDING THIS ISSUE.
 
Web Link
Link to FedBizOpps document.
(http://www.fbo.gov/spg/USDA/FS/0261/AG-9360-S-07-0011/listing.html)
 
Place of Performance
Address: Markleeville, CA
Zip Code: 96120
Country: UNITED STATES
 
Record
SN01344902-F 20070719/070717223458 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.