Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF AUGUST 16, 2007 FBO #2089
MODIFICATION

15 -- UH/HH-60 Blade Fold Kit (BFK)

Notice Date
8/14/2007
 
Notice Type
Modification
 
NAICS
336413 — Other Aircraft Parts and Auxiliary Equipment Manufacturing
 
Contracting Office
US Army Aviation and Missile Command (Aviation), ATTN: AMSAM-AC, Building 5303, Martin Road, Redstone Arsenal, AL 35898-5280
 
ZIP Code
35898-5280
 
Solicitation Number
W58RGZ07R0507
 
Response Due
8/31/2007
 
Archive Date
10/30/2007
 
Point of Contact
ROSA L. UPCHURCH,Contract Specialist,(256)876-0927 or BENETTA HALBERT,Contracting Officer,(256)876-3912
 
E-Mail Address
Email your questions to US ARMY AVIATION & MISSILE COMMAND
(ROSA.UPCHURCH@US.ARMY.MIL)
 
Small Business Set-Aside
Service-Disabled Veteran-Owned
 
Description
The proposed contract is set-aside for service-disabled veteran-owned small business concerns. Offers from other than service-disabled veteran-owned small business concerns will not be considered. This procurement is for the production of UH/HH-60M Blade Fold Kits (BFKs) and a redesign of the existing UH/HH-60M (BFK) to make it usable on all versions of the UH/HH-60 aircraft. (1) As part of the Base effort, the Contractor will be required to accomplish the following: (a) Develop a UH-60A/L Blade Fo ld Adapter Kit (BFAK) to configure the current BFK so that it can be utilized on all UH/HH-60 aircraft. (b) Update the existing drawings to incorporate the design changes, conduct a Finite Element Analysis (FEA) on the current kit and the new kit design, and develop maintenance instructions for use of the redesigned kit on the UH/HH-60A/L and the UH/HH-60M. (c) Manufacture, test, and deliver one (1) prototype BFAK for use in conduct of Government conducted First Article Test (FAT). The prototype BFAK sh all be delivered to the Government NLT 30 working days prior to start of the FAT. Manufacture of the reconfigured kits will be included in the contract as an OPTION. (d) Manufacture one (1) prototype UH/HH-60M BFK, utilizing the approved drawings, for use in Government conducted FAT. (e) After completion of the Government conducted FAT, manufacture fifty (50) UH/HH-60M BFKs (includes the prototype BFK). (2) An Option will be included in the contract for the reconfigured BFK. If the option is exercised, the contractor shall: (a) Manufacture one (1) UH/HH-60 BFK, utilizing the updated drawings developed under the base effort, for use in a Government conducted FAT. (b) After successful completion of the Government conducted FAT, manufacture a minimum fifty (50) to a maximum of one hundred (100) UH/HH-60 BFKs (to include the FAT BFK). Interested sources wishing to obtain a copy of the drawing package or request For Proposal (RFP) should submit a request to Rosa Upchurch via email.
 
Place of Performance
Address: US Army Aviation and Missile Command (Aviation) ATTN: AMSAM-AC-BH-A, Building 5308, Sparkman Center Redstone Arsenal AL
Zip Code: 35898-5280
Country: US
 
Record
SN01372293-W 20070816/070814221751 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.