Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF SEPTEMBER 22, 2007 FBO #2126
SOLICITATION NOTICE

66 -- MATERIAL TEST FRAME FOR FIRST (AFRL/VASA) LABORATORY 6.2 RESEARCH (Quantity: 2 each) Specifications are included

Notice Date
9/20/2007
 
Notice Type
Solicitation Notice
 
NAICS
334519 — Other Measuring and Controlling Device Manufacturing
 
Contracting Office
Department of the Air Force, Air Force Materiel Command, AFMC - Air Force Materiel Command Headquarters, HQ AFMC/PKX 4375 Chidlaw Rd Ste 6, Wright-Patterson AFB, OH, 45433, UNITED STATES
 
ZIP Code
45433
 
Solicitation Number
F4FBFR7250A001
 
Response Due
9/25/2007
 
Archive Date
10/10/2007
 
Point of Contact
Sue Quillen, Contract Specialist, Phone 937-522-4645, Fax 937-656-1412,
 
E-Mail Address
sue.quillen@wpafb.af.mil
 
Description
The Government (88 CONS/PKA) intends to solicit and negotiate with only one source under the authority of FAR 13.106-1(b) and FAR 6.302-1(b)(1)(ii). The proposed source is: MTS Systems Corporation, Eden Prairie, MN. The item being procured is: Material Test Frame for FIRST (AFRL/VASA) Laboratory 6.2 Research. The Specifications are: (a) 6 inch Stroke; (b) 11 kip capacity; (c) 21 inches between the columns; (d) Minimum Test Frame Stiffness 2.6 x 108 N/m (1.5 x 106 lb/in); (e) Minimum Vertical test space 50 inches; (f) Integrated E-stop in Base enclosure; (g) Load unit must have grip controls integrated into the Base enclosure; (h) Load unit must have controls for lift and locks integrated into the base of the machine; (i) Load unit must have double acting hydraulic lifts; (j) Load unit must have ability for the upper and lower crosshead attachments to be aligned and meet ASTM E1012; (k) HSM must have integrated hydraulic flow limited actuator velocity control circuit; (l) Load unit actuator must be integrated into the baseplate, Bolt-on actuators are ?Unacceptable,? (m) Load unit must have modular HSM architecture for allowing up to 4 servovalves, to be integrated without the need for additional manifolding; (n) Load unit actuator must have direct hydraulic porting, without the need of flanges or manifolds; This notice is being published for information purposes only, and is not a request for competitive quotations. However, any quotations received within three (3) business days of the issuance of this notice will be considered by the Government. A determination by the Government not to compete this proposed contract based upon responses to this notice is solely within the discretion of the Government. Information received will normally be considered solely for the purpose of determining whether to conduct a competitive procurement. Any quotations should be e-mailed to Sue.Quillen@wpafb.af.mil or faxed to 937-656-1412, NLT, COB: TUESDAY, 25 SEPTEMBER 2007. Any questions, please contact: Sue Quillen at 937-522-4645. NOTE: THIS NOTICE WAS NOT POSTED TO FEDBIZOPPS ON THE DATE INDICATED IN THE NOTICE ITSELF (20-SEP-2007); HOWEVER, IT DID APPEAR IN THE FEDBIZOPPS FTP FEED ON THIS DATE. PLEASE CONTACT fbo.support@gsa.gov REGARDING THIS ISSUE.
 
Web Link
Link to FedBizOpps document.
(http://www.fbo.gov/spg/USAF/AFMC/AFMC/F4FBFR7250A001/listing.html)
 
Place of Performance
Zip Code: 45433-7765
 
Record
SN01412350-F 20070922/070921080424 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.