Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF SEPTEMBER 30, 2007 FBO #2134
MODIFICATION

Y -- AZ PRA GRCA 15(1) & 12(3), Hermit Road and South Entrance, Grand Canyon National Park

Notice Date
9/28/2007
 
Notice Type
Modification
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
Department of Transportation, Federal Highway Administration (FHWA), Central Federal Lands Highway Division, 12300 West Dakota Avenue, Lakewood, CO, 80228, UNITED STATES
 
ZIP Code
00000
 
Solicitation Number
DTFH68-08-B-00008
 
Response Due
11/14/2007
 
Archive Date
1/14/2008
 
Point of Contact
Tiffany Atchison, Contract Specialist, Phone 720-963-3354, Fax 720-963-3360, - Brenda McGehee, Contract Specialist, Phone (720) 963-3353, Fax (720) 963-3360
 
E-Mail Address
tiffany.atchison@fhwa.dot.gov, CFLContracts@fhwa.dot.gov
 
Description
PROJECT DETAILS: This project is located in Grand Canyon National Park, and is titled AZ PRA GRCA 15(1) & 12(3), Hermit Road and South Entrance Road. This project will consist of one schedule for grading, drainage and surfacing on 7.11 miles of Hermit Road, and two options ? one for widening and bypass lane construction on 1.34 miles of the South Entrance Road and one for 1.98 miles of greenway/bike path along Hermit Road. There is an incentive completion date of November 2008. Estimated price range is between $12,000,000 and $18,000,000. Principal work items on the schedule include: Lump sum construction survey and staking; lump sum contractor testing; 23,570 ln ft of soil erosion control, silt fence; 25 acres of clearing and grubbing; 25,660 cu yd of roadway excavation; 1,091 sq ft of reinforced concrete retaining wall; 139,000 sq yd of 8-inch depth pulverizing; 8,910 tons of roadway aggregate, method 1; 31,980 tons of superpave pavement; 310 tons of antistrip additive; 185 tons of prime coast; 1,015 tons of blotter; 4,220 sq yd of pain rigid pavement, 8-inch depth; 500 ln ft of pipe culvert, various sizes; 1,747 ln ft of 9-inch deep stone curb; 5,197 sq yd of asphalt sidewalk; 4,900 cu yd of conserved topsoil (placed); 2,000 hrs of temporary traffic control (flagger); lump sum construction of bus loop shade shelter; all of the above along with associated removal of headwalls, signs, pipe culverts, concrete sidewalks; place riprap; removing and resetting boulders; fencing and gates; rental equipment; labor services; and pavement markings. Tentative advertisement date is October 1, 2007. PLEASE NOTE: The Invitation for Bid will be available for download after October 1, 2007, from the Federal Business Opportunities (FBO) website at www.fedbizopps.gov. PLANS WILL BE AVAILABLE FOR DOWNLOAD IN ADOBE (.pdf) FORMAT ONLY ON CFLHD's WEBSITE at http://www.cflhd.gov/procurement/construction/advertised-projects.cfm under the Project Name. In order to view the plans, interested vendors must register through the CFL website. Other information regarding this solicitation is also available at the above website. If you have problems accessing information on the website, please call (720) 963-3353 or (720) 963-3354. Technical questions specific to the project will only be addressed by FHWA via written correspondence to e-mail address CFLContracts@fhwa.dot.gov or FAX to (720) 963-3360.
 
Place of Performance
Address: Grand Canyon National Park, P.O. Box 129, Grand Canyon, AZ
Zip Code: 86023
Country: UNITED STATES
 
Record
SN01424159-W 20070930/070928223437 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.