Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF OCTOBER 27, 2007 FBO #2161
SOLICITATION NOTICE

C -- IDIQ contract for the Preparation of Design Report & Plans & Specifications for the Construction of Houma Nav. Lock, Morganza to the Gulf of Mexico Hurricane Protection Project, Terrebonne Parish, LA, New Orleans & Vicksburg Districts

Notice Date
10/25/2007
 
Notice Type
Solicitation Notice
 
NAICS
541330 — Engineering Services
 
Contracting Office
US Army Engineer District, Vicksburg, ATTN: CEMVK-CT, 4155 Clay Street, Vicksburg, MS 39183-3435
 
ZIP Code
39183-3435
 
Solicitation Number
W912EE-08-O-0001
 
Response Due
11/26/2007
 
Archive Date
1/25/2008
 
Point of Contact
b4ctcsdt, (601)631-5820
 
E-Mail Address
Email your questions to US Army Engineer District, Vicksburg
(stacy.d.thurman@mvk02.usace.army.mil)
 
Small Business Set-Aside
N/A
 
Description
The USACE Vicksburg District intends to modify Contract No. DACW38-01-D-0005 with the URS Group, Inc. to increase the contract value by $10 million on a SOLE SOURCE BASIS under the authority provided by 10 U.S.C. 2304 (c) (1). The contract is an Ind efinite Delivery/Indefinite Quantity (IDIQ) contract for the Preparation of Design Report and Plans and Specifications (P&S) for the Construction of Houma Navigation Lock, Morganza to the Gulf of Mexico Hurricane Protection Project, Terrebonne Parish, Loui siana, New Orleans and Vicksburg Districts. Currently the contract has a value of $10 million with a base year and six option periods. The project design and P&S were near 50% completion when Hurricane Katrina made landfall in Louisiana. As a result of Hur ricanes Katrina and Rita the design flow line that governs the entire structural design of this project was significantly increased, requiring a portion of the design already complete to be substantially redesigned in order to regain the 50% complete statu s. The Vicksburg District has determined that modifying URS contract to complete the design from that point is the only reasonable means available to the Government to ensure mission requirements for completing the design of the Houma Navigation Canal Loc k and Floodgate from an economical and technical standpoint. Selection of a new firm to complete the design at this stage would result in delays that are unacceptable to local cost-sharing sponsors and additional costs associated with verification of compl eted work before assuming liability for the total design. THIS IS NOT A REQUEST FOR PROPOSAL. Notwithstanding, any firm that believes it is capable of satisfying Vicksburg Districts requirements may contact Mr. Randy Brown at 601 631-7249 for additional i nformation. A determination not to complete the requirement based on responses to this notice is solely within the discretion of the Government.
 
Place of Performance
Address: US Army Engineer District, Vicksburg ATTN: CEMVK-CT, 4155 Clay Street Vicksburg MS
Zip Code: 39183-3435
Country: US
 
Record
SN01441117-W 20071027/071025224925 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.