SOLICITATION NOTICE
25 -- NAICS: 33 Sub sector 333 Machinery and Manufacturing SIC: 35 Industrial & Commercial Machinery & Computer Equipment DESC: M9 Armored Combat Earthmover (ACE) Modernization/Upgrade
- Notice Date
- 11/5/2007
- Notice Type
- Solicitation Notice
- Contracting Office
- M67854 Quantico, VA
- ZIP Code
- 22134-5010
- Solicitation Number
- M6785408R5012
- Response Due
- 12/20/2007
- Archive Date
- 1/19/2008
- Point of Contact
- William M. Cartis (Woody 703 432 5006 William M. Cartis 703 432-5006
- Description
- M9 Armored Combat Earthmover (ACE) Modernization/Upgrade DESCRIPTION: Marine Corps Systems Command (MARCORSYSCOM), has a requirement to procure (18) modernized M9 ACE?s modernization kits and possibly hulls that are intended to exceed the capabilities of the existing system in the following areas: speed/stamina, reliability and maintainability, tractive effort, ballistic protection, driver vision, and self protection. The M9 ACE Modernization Program is currently in the Operations and Support phase of the acquisition cycle. The M9 ACE Required Operationally Capability (ROC) identifies the following Pre-Planned Product Improvement (P3I) requirements for the M9 ACE: power train, steering, suspension, environmental systems, tracks, increased ballistic protection (hardening), and increased combat support and, track-width mine plow, ripper attachment, multipurpose bucket, trencher, and weapons mount for the standard United States Marine Corps machine gun. The program will upgrade the Marine Corps M9 ACE to the Army?s fielded M9 ACE System Improvement Program ? 4 (SIP-4) configuration along with Marine Corps specific capabilities. The program?s emphasis is on commonality of components across Marine Corps like systems and the utilization of Commercial-Off-the-Shelf and Government-Off-the-Shelf components. The Program Office will provide two M9 ACEs as Government Furnished Equipment to a commercial vendor for integration, fabrication, and verification of the modernization kits. Marine Corps Logistics Command (MCLC), Maintenance Center, Albany will work directly with the kit vendor during the integration process and will subsequently be the designated vendor for the installation and final assembly of the 16 Modernized M9 ACEs. The Contractor shall fabricate 16 M9 ACE Modernization Kits and ship to MCLC, Albany, GA. The Contractor will be required to fabricate hulls. The Contractor shall provide technical support to MCLC, Al! bany during the final systems assembly. It is anticipated Production Verification Testing will be performed on the first two Modernized M9 ACE systems during 1st Quarter Fiscal Year (FY) 09. Marine Corps Logistics Command, Albany assembly of the remaining 16 M9 ACE Modernization Kits will be accomplished during FY09. The Modernized M9 ACE will be fielded to a single CEB beginning in FY10. POINT OF CONTACT: If you have any questions regarding this synopsis, please contact the Contracting Specialist, William M. Cartis at (703) 432-5006. A draft solicitation has been posted to NECO and FedBizOpps. Industry is requested to provide comments, suggestions and or improvements to this document by 20 Nov. 2007. The NECO FTP site https://www.neco.navy.mil/biz_opps/search_edi.cfm. NOTE: THIS NOTICE WAS NOT POSTED TO FEDBIZOPPS ON THE DATE INDICATED IN THE NOTICE ITSELF (05-NOV-2007); HOWEVER, IT DID APPEAR IN THE FEDBIZOPPS FTP FEED ON THIS DATE. PLEASE CONTACT fbo.support@gsa.gov REGARDING THIS ISSUE.
- Web Link
-
Link to FedBizOpps document.
(http://www.fbo.gov/spg/DON/USMC/M67854/M6785408R5012/listing.html)
- Record
- SN01446947-F 20071107/071105224608 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |