MODIFICATION
Y -- Multiple Award Task Order Contract (MATOC) for Construction and/or Design/Build of Tactical Equipment Maintenance Facility (TEMF) for the Southeast Region (AL, FL, GA, KY, MS, NC, SC, and TN.
- Notice Date
- 1/11/2008
- Notice Type
- Modification
- NAICS
- 236220
— Commercial and Institutional Building Construction
- Contracting Office
- US Army Corps of Engineers, Savannah, P.O. Box 889, Savannah, GA 31402-0889
- ZIP Code
- 31402-0889
- Solicitation Number
- W912HN-07-R-0095
- Response Due
- 9/30/2008
- Archive Date
- 11/29/2008
- Point of Contact
- Jose Cruz, 912-652-5801
- E-Mail Address
-
Email your questions to US Army Corps of Engineers, Savannah
(jose.a.cruz@usace.army.mil)
- Small Business Set-Aside
- 8a Competitive
- Description
- This modification changes the initial task order location from Fort Stewart GA to Fort Campbell KY. Multiple Award Task Order Contract (MATOC) for Construction and/or Design/ Build of Tactical Equipment Maintenance Facility (TEMF) for the Sout heast Region (AL, FL, GA, KY, MS, NC, SC, TN). A TEMF Fort Campbell, KY project will be the Seed Project that will be used in the evaluation of PHASE II and the first task order of one of the contracts that will be awarded. The life of the basic contract is for a base of three years. This acquisition is being offered for competition limited to eligible 8(a) concerns. The life of the basic contract is for a base period of three years or $60M whichever occurs first. The pool size (number of contract that may be awarded) is anticipated to range from 3-4 contractors. The pool of contractos, which successfully receive an award, will share the total contract capacity. The project will be solicited and procured using Best Value Trade-Off methodology based on the Two-Phase Design Build Process in accordance with Federal Acquisition Regulation (FAR) Subpart 36.3. The magnitude for the seed task order is between $10M and $25M. Task orders issued under this MATOC will be firm-fixed price. The seed task order m ay include options. Description of work: Task Orders issued under this contract will be for the design and construction, or the construction only, of Tactical Equipment Maintenance Facilities. These facilities will be used for the maintenance, re pair, and storage of military tactical vehicles and equipment. The facilities are usually part of an overall complex centered on a vehicle maintenance facility. A major part of most projects will include extensive concrete hardstand and fencing. Develop ment of the facility may also include associated site development necessary to construct TEMF. Heating and air conditioning will generally be provided by self-contained units. Comparable projects in the private sector that are similar to the construction contemplated include: heavy equipment maintenance facilities, vehicle fleet service facilities, and jiffy-lubes. This solicitation will be issued in electronic format only. Paper copies ofthis solicitation will not be available. Other methods of requesting a package will not be honored. Offerors must register in the Central Contractor Registration (CCR) at www.ccc.gov.After completing CCR, in order to download RFP documents contractors and their subcontractors must register at Federal Technical D ata System (FedTeDS) at www.fedteds.gov.In order to locate solicitation Contractors can go to FedBizOpps and search for the solicitation number at www.fedbizopps.gov. Contractors can register to be put on a plan holders list that others can access through the FedBizOpps site. It is the Offerors responsibility to check the Internet address provided as necessary for any posted changes to this solicitation and all amendments. The evaluation factors and their importance is listed below for the seed pro ject: The following evaluation factors for Phase I and level of importance Factor 1-1 CORPORATE RELEVANT SPECIALIZED EXPERIENCE, Factor 1-2 PAST PERFORMANCE, and Factor 1-3 TECHNICAL APPROACH NARRATIVE. Factor 1-1 is more important than factors 1-2 and 1 -3. Factor 1-2: is equal in importance to Factor 1-3 Factors 1-1, 1-2, 1-3, together are equal importance to Factor 2-1. The following are the evaluation factors and level of importance for Phase II: Factor 2-1: DESIGN TECHNICAL This factor is comp rised of the following four sub-factors: 2-1-1, Building Function and Aesthetics; 2-1-2, Quality of Building Systems; 2-1-3, Site Design; and, 2-1-4, Sustainable Design. Factor 2-2 PROPOSED CONTRACT DURATION AND SUMMARY SCHEDULE. Factor 2-3 SMALL AND SM ALL DISADVANTAGED BUSINESS UTILIZATION FACTOR 2-1: Equal in importance to all Phase 1 factors combined. Sub-Factor 2-1-1: A most important sub-factor equal in importance to Sub-Factor 2-1-2. Sub-Factor 2-1-2: A most important sub-factor equal in importance to Sub-Factor 2-1-1. Sub-Factor 2-1-3: Slightly less important than Sub-Factors 2-1-1 and 2-1-2. Sub-Factor 2-1-4: Slightly less important than Sub-Factor 2-1-3. FACTOR 2-2: Slightly less important than Factor 2-1. FACTOR 2-3: Slightly less important than Factor 2-2. All non-cost factors, when combined, are significantly more important than Price. Award will be made to an Offeror whos e technical submittal and price proposal contain the combination of the criteria requested that offers the best value to the Government. Proposals shall include sufficient detailed information to allow complete evaluation. The Government reserves the rig ht to reject any and all offers. Offerors are reminded that while the Government may elect to consider data obtained from other sources, the burden of proof of acceptability rests with the Offeror. Phase One for this solicitation will be issued in electro nic format only and will be available on or about 14 January 2008. Note: Response Date referenced under General Information does not refer to the PROPOSAL DUE DATE. Information on the PROPOSAL DUE DATE will be stated in the solicitation.
- Place of Performance
- Address: US Army Corps of Engineers, Savannah P.O. Box 889, Savannah GA
- Zip Code: 31402-0889
- Country: US
- Zip Code: 31402-0889
- Record
- SN01484074-W 20080113/080111225717 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |