SOLICITATION NOTICE
29 -- Fuel Manifold Fill Valve
- Notice Date
- 4/3/2008
- Notice Type
- Presolicitation
- NAICS
- 336412
— Aircraft Engine and Engine Parts Manufacturing
- Contracting Office
- DEPARTMENT OF THE AIR FORCE; 3001 STAFF DR STE 2AG1 109B; TINKERAFB; OK; 73145
- ZIP Code
- 73145
- Solicitation Number
- FA8104-08-Q-0136
- Response Due
- 5/5/2008 5:00:00 PM
- Archive Date
- 7/4/2008
- Point of Contact
- Tuyen Diep, Phone 405-739-5501, Fax 405-734-8106, - Tony R Kyzer, Phone 405-734-8103, Fax405-734-8106
- E-Mail Address
-
uyen.diep@tinker.af.mil, Tony.Kyzer@tinker.af.mil
- Description
- THIS IS CONSIDERED TO BE A COMBINED SYNOPSIS AND SOLICITATION. SEESOLICITATION FA8104-08-Q-0136 FOR MORE INFORMATION. 1.Estimated issue date and estimated closing/response date -Issued 3 Apr 2008; Closes 5 May 2008 2.RFP# - FA8104-08-Q-0136 3.PR# - FD2030-08-71197 4.Nomenclature/Noun - Fuel Manifold Fill Valve 5.NSN - 2915-01-196-4328 6.PN - 7113M61G01 7.Application (Engine or Aircraft) - F-101 8.AMC - 3C 9.History - No historical record 10.Description: The F101 Fuel Manifold Fill Valve is a sub component of the AugmentorFuel Control. The circulation flow rate to keep manifolds filled is afunction of augmenter fuel control inlet pressure (PR) and MEC servopressure (PC). The manifold fill valve spool turns off all circulationflow to fuel manifolds during non-augmentation and when engine is shutdown. Flow is regulated at discharge pressure (PB1). Duringnon-augmented operation, the manifold fill valve uses filtered flowprovided by the engine fuel boost pump to circulate fuel to the core,fan, and local manifolds. This keeps manifolds filled to avoid delayand to provide smooth augmenter response. The fuel from the manifoldsis returned to the manifold fill valve and is then routed back to theengine fuel boost pump (PIR). Circulation flow enters augmenter fuelcontrol from the inlet and discharges through the normal dischargeports. The return flow from manifolds join and return to the fuelcontrol through a single port. Dimensions: Approximately 3 inchesdiameter X 6 inches long; composed of aluminum allow/steel; weighsapproximately 1.5 lbs. Total Required Qty: BEQ: 3 Ea; MIN: 1 EA; MAX: 5 Ea CLIN 0001 (New Manufactured Material)Destn: FB2039, Tinker AFB, OK., 73145-9013. Delivery: 30 NOV 2010 Electronic procedure will be used for this solicitation. To: GENERAL ELECTRIC COMPANY, CINCINNATI, OH., 45215-1988. 11.Mandatory Language: The proposed contract action is for supplies and services for which theGovernment intends to solicit and negotiate with only one, or a limitednumber of sources under the authority of FAR 6.302. Interested personsmay identify their interest and capability to respond to the requirementor submit proposals. This notice of intent is not a request forcompetitive proposals. However, all proposals received within fortyfive-days (thirty days if award is issued under an existing basicordering agreement) after date of publication of this synopsis will beconsidered by the Government. A Determination by the Government not tocompete this proposed contract based upon responses to this notice issolely within the discretion of the Government. Information receivedwill normally be considered solely for the purpose of determiningwhether to conduct a competitive procurement. See Note(s) 26. 12.Export Control - No
- Record
- SN01547223-W 20080405/080404000941-97b08b0016009fb16cdd0fc6742d1e67 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |