FBO#2326
25 - Vehicular Equipment Components
SOLICITATIONS - April 9, 2008
- SPM4A208R0021 - Presolicitation
LEAD, IGNITION, ENGINE -- HELICOPTER, HH60, GE T-700 (UH-60A) ENGINE
Defense Logistics Agency, Acquisition Management, Defense Supply Center Richmond
- SPM7L3-08-R-0045 - Presolicitation
CONTROL ASSEMBLY, TR
Defense Logistics Agency, Acquisition Management, Defense Supply Center Columbus BSM
- SPM7LX08R0085 - Presolicitation
SPM7LX08R0085
Defense Logistics Agency, Acquisition Management, Defense Supply Center Columbus BSM
- W56HZV08R0399 - Presolicitation
VEHICULAR EQUIPMENT COMPONENTS.NOUN: TACH REPLACEMENT, NSN: 2541-01-494-6557 P/N:3415712 CAGE:45152 QTY: 215 100% OPTION FOB: DESTINATION
Department of the Army, U. S. Army Materiel Command, U.S. Army TACOM Life Cycle Management Command (Warren)
- W56HZV08R0484 - Presolicitation
VEHICULAR EQUIPMENT COMPONENTS. NOUN: PUMP ASSEMBLY, POWER NSN: 2530-01-337-7345 MFG P/N RP70105X CAGE 06721; MFG P/N 14-12049-000 CAGE 64678. QTY: 160, 100% OPTION.
Department of the Army, U. S. Army Materiel Command, U.S. Army TACOM Life Cycle Management Command (Warren)
- W911N2-08-R-0099 - Presolicitation
CUT AND DE-BURR ARMOR PLATE (STEEL AND ALUMINUM) WITH ANY AVAILABLE TECHNOLOGY (LASER, PLASMA, WATERJET), IAW THE DRAWINGS PROVIDED.
Department of the Army, U. S. Army Materiel Command, Letterkenny Army Depot
| This Issue's Index | Today's FBO Daily Index Page |
Created on 07-Apr-2008 by Loren Data Corp. -- info@fbodaily.com