Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF MAY 11, 2008 FBO #2358
DOCUMENT

48 -- Treated Water Pump Isolation Valves - Solicitation 1

Notice Date
5/9/2008
 
Notice Type
Solicitation 1
 
NAICS
238220 — Plumbing, Heating, and Air-Conditioning Contractors
 
Contracting Office
General Services Administration, Public Buildings Service (PBS), Heating Operation & Transmission Division (WPO), 13th & C Streets, SW, 2nd Floor, Washington, District of Columbia, 20407
 
ZIP Code
20407
 
Solicitation Number
GS11P08YMP0098
 
Response Due
6/23/2008 1:00:00 PM
 
Point of Contact
Barbara A Garrett,, Phone: 202-690-9732, Joseph Brown,, Phone: 202-690-9720 ext. 286
 
E-Mail Address
barbara.garrett@gsa.gov, joseph.brownIII@gsa.gov
 
Small Business Set-Aside
N/A
 
Description
A site visit will be held as follows: Date: May 22, 2008 Time: 10:00 a.m. Location: Central Heating Plant, 13th & C Sts., SW, Washington, DC 20407 If you are planning to attend the site visit, please notify Barbara Garrett by 3:00 p.m. May 21, 2008. Please provide the names of your representative(s) attending, name of company and telephone number. Email: barbara.garrett@gsa.gov Fax: (202) 690-9777 Telephone: (202) 690-9720 Hard hats must be worn during the walkthrough; therefore all offerors are requested to bring hard hats. Scope of work: Remove the existing two 12-inch hotwell-to-treated water pumps gate valves and replace these valves with equivalent flanged stainless steel gate valves. Remove the existing six eight-inch TWP inlet and discharge isolation valves and replace these valves with the equivalent flanged stainless steel gate valves. Remove the three existing eight-inch discharge globe body check valves and replace these valves with equivalent flanged stainless steel silent globe body silent check valves. All newly installed fasteners (nuts, bolts) will be stainless steel and will be installed with stainless steel washers. All nuts will be bearing on their associated washers. There will be a need to fabricate or purchase flexitallic gaskets for the flanged connections associated with each of the newly installed valves. Cut sheets of the new valves to be installed will be required to be submitted to and approved by GSA Project Manager before construction is to commence. This solicitation will be issued on/about May 28, 2008 and the due date will be on/or about June 23, 2008.
 
Web Link
FedBizOpps Complete View
(https://www.fbo.gov/?s=opportunity&mode=form&id=0d954a2b8de64cde5db331f5e68cb3c4&tab=core&_cview=1)
 
Document(s)
Solicitation 1
 
File Name: This is the complete scope and specifications for the Treated Water Pump Isolation Valves. (Replace Treated Water Pump Valves.doc)
Link: https://www.fbo.gov//utils/view?id=69787be5e87863c0045781d9806891ca
Bytes: 77.00 Kb
 
Note: If links are broken, refer to Point of Contact above or contact the FBO Help Desk at 877-472-3779.
 
Place of Performance
Address: GSA, Central Heating and Refrigeration Plant, 13th & C Streets, SW, Washington, District of Columbia, 20407, United States
Zip Code: 20407
 
Record
SN01569978-W 20080511/080509215349-0d954a2b8de64cde5db331f5e68cb3c4 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.