Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF MAY 24, 2008 FBO #2371
SOLICITATION NOTICE

A -- Broad Agency Announcement UNMANNED and AUTONOMOUS SYSTEMS TESTING (UAST)

Notice Date
5/22/2008
 
Notice Type
Modification/Amendment
 
NAICS
541712 — Research and Development in the Physical, Engineering, and Life Sciences (except Biotechnology)
 
Contracting Office
Department of the Army, Army Contracting Agency, South Region, ACA, White Sands Missle Range, ACA, White Sands Missile Range, Directorate of Contracting, Bldg 143, 2nd Floor, Crozier Street, White Sands Missile Range, NM 88002-5201
 
ZIP Code
88002-5201
 
Solicitation Number
BAA-UAST0002
 
Response Due
6/2/2008
 
Point of Contact
Norma M. Martinez, 575 678-3481
 
Small Business Set-Aside
N/A
 
Description
Fifth set of questions and answers: Note: Deadline for questions is 23 May 2008. 1. My company is interested is submitting a whitepaper to the UAST BAA. I have a question pertaining to the Gantt chart that is to be submitting in the whitepaper content and the schedule that is to be submitted over and above the 15 page whitepaper limit. There is some confusion as to what is the difference between the schedule in the whitepaper content and the Gantt chart that is to be submitted separately. Response: 2. There is no difference in the data content within the white paper and the Gantt chart. However, the Government is requesting that the actual Microsoft Project file for the Gantt chart also be included separately within the same CD. Is there a difference? Response: No difference 3. I see on Page 26 Item 4 says 4. Provide a summary Gantt chart, identifying the major elements of the project, including preliminary and critical design phases and deliverables. Response: Again, the Government is requesting this same information as part of the whitepaper write-up. 4. Page 26 Item 6 says 6. Provide a separate Microsoft Project file of the Gantt chart (See Appendix F). Response: This is correct. However, all required Appendixes are part of the whitepaper, and yes they are over and above the 15 page whitepaper limit. In other words, there is no penalty for exceeding the 15 page limit if the extra pages pertain to Appendixes. 4. The BAA also states on Page 28 Item iii says iii) 1 Page: Schedule illustrating major milestones and any decision gates. Describe any leveraging opportunities and considerations with other related efforts. Also represent any dependencies from leveraged efforts. To me, a Project Gantt chart is to be submitted over and above the 15 pages of the whitepaper. This Gantt chart will illustrat(e) major milestones and any decision gates. Describe any leveraging opportunities and considerations with other related efforts. Also represent any dependencies from leveraged efforts. But the Gantt chart that goes in the whitepaper content (Item 4) will be a summary of the project indicating phases and deliverables. This would be a reflection of the Technical Approach section of the whitepaper. Am I correct in my assumption or are these items the same? Response: That is correct.
 
Web Link
FedBizOpps Complete View
(https://www.fbo.gov/?s=opportunity&mode=form&id=fa5f37ce13389169c1fa111477876c53&tab=core&_cview=1)
 
Place of Performance
Address: ACA, White Sands Missile Range Directorate of Contracting, Bldg 143, 2nd Floor, Crozier Street White Sands Missile Range NM
Zip Code: 88002-5201
 
Record
SN01579508-W 20080524/080522221054-fa5f37ce13389169c1fa111477876c53 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.