SOLICITATION NOTICE

Y -- Construction, Seismic Corrections Bldgs 205 and 114, VA,PAHCS, Menlo Park, CA

Notice Date
7/17/2008
 
Notice Type
Presolicitation
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
Department of Veterans Affairs, VA Northern California Health Care System, Department of Veterans Affairs No. California Health Care System System, VA Northern California HealthCare System;5342 Dudley Blvd. Bldg 98;McCllelan Business Park CA 95652
 
ZIP Code
95652
 
Solicitation Number
VA-261-08-RP-0266
 
Response Due
8/31/2008
 
Archive Date
10/30/2008
 
Point of Contact
Thomas HartContract Specialist
 
Small Business Set-Aside
Service-Disabled Veteran-Owned
 
Description
Department of Veterans Affairs Project No. 640-364 Seismic Corrections B205 and B114 Palo Alto Health Care System (PAHCS) Menlo Park Division (MPD) California Estimated Price Range is between $5,000,000 and $10,000,000. Competitive Negotiated Acquisition (Source Selection) (IAW FAR Part 15.3) RFP to be issued electronically at FBO Website RFP Issue Date: 31 July 2008 Proposal Due Date: 31 August 2008 Scope of Work: Work includes the construction for a new building in accordance with the design drawings and specifications. The project consists of a new 22,000 square foot to house shops and supporting office facilities and services for engineering staff for the Menlo Park campus. The building is a one story masonry enclosed building. The structure is comprised of reinforced concrete foundations, slab on grade, structural steel columns, beams, and crossbraces, and suspended metal deck with lightweight concrete slab. Exterior cladding includes steal stud wall framing with sheathing and insulation, aluminum framed glazing, masonry veneer, acrylic plaster. Painted gypsum board on the interior face of exterior walls is also included. Exterior doors, fascia, sunscreens, and soffits are also included. Roofing includes built-up roofing system, flashing, caulking, sheet metal column enclosure, walk pads, and access hatch and ladder. Interior partitions include metal stud framed partitions with painted gypsum board surfacing, underlayment and batt insulation. Operation partition, glazing, and interior doors are also included. Floor finishes include, carpet, rubber flooring, sealed concrete, seamless epoxy, sheet vinyl, and ceramic tiles. Ceiling finishes include suspended ACT, vinyl ACT, painted gypsum board, and gypsum board bulkhead. Wall finishes include ceramic tile and epoxy paint. Function equipment and specialties include toilet partitions and accessories, fixed casework and shelving, and sinks, signage, projection screens, window shading, wall to wall porcelain markerboards (conference room) and tackboards, and fire extinguishers and cabinets. Plumbing includes sanitary and institutional fixtures, floor drains, hose bibs, waste, vent and domestic cold and hot water pipe work, HVAC equipment condensate drainage, water heating equipment, and distribution pipe work, including hot and cold water, and roof drainage. Heating, Ventilating, & Air Conditioning includes boiler, air-cooled chiller, expansion tank, air separator, heater hot water and chilled water pumps, pipe work distribution including heater hot water and chilled water, air handling unit, terminal boxes and split system AC units. Air distribution and return, including building management, general ventilation and relocation of existing air cooled chiller. Electrical work includes service and distribution, machine and equipment connections, user convenience power, lighting, light and power specialties, telephone-data and communications including fire alarm system, security access and alarm rough-ins only, trade demolition, and testing. Fire protection includes a complete automatic wet sprinkler system. Sitework includes site storm drainage, vehicular and pedestrian paving, landscaping, and miscellaneous accessories. ite utilities include domestic and fire water, sewer and natural gas, power feeder duct bank, and telecom ductbanks. Duration: Total time duration not to exceed: Construction Period: Total time: 16 months for construction time including punchlist inspection and construction touch-ups.
 
Web Link
FedBizOpps Complete View
(https://www.fbo.gov/?s=opportunity&mode=form&id=baf714829090ca9613a8af6606628d30&tab=core&_cview=1)
 
Record
SN01616136-W 20080719/080717220015-baf714829090ca9613a8af6606628d30 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.