Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF JULY 23, 2008 FBO #2431
SOLICITATION NOTICE

66 -- STAINLESS STEEL TANK

Notice Date
7/21/2008
 
Notice Type
Modification/Amendment
 
NAICS
332420 — Metal Tank (Heavy Gauge) Manufacturing
 
Contracting Office
NASA/George C. Marshall Space Flight Center, Procurement Office, Marshall SpaceFlight Center, AL 35812
 
ZIP Code
35812
 
Solicitation Number
NNM08245591Q
 
Response Due
7/25/2008
 
Archive Date
7/21/2009
 
Point of Contact
Betty C. Kilpatrick, Contract Specialist, Phone 256-544-0310, Fax 256-544-6062
 
E-Mail Address
betty.c.kilpatrick@nasa.gov
 
Small Business Set-Aside
Total Small Business
 
Description
This is a modification-3 to the synopsis entitled Instruments and LaboratoryEquipment which was posted on 6/30/2008. You are notified that the following changes aremade: ADDRESS ANY QUESTIONS/QUOTES TO JANET APPLETON AT janet.l.appleton@nasa.gov or FAX256-544-6560.1. QUESTION:What initial temperature does the tank need to be heated from?ANSWER:Once the tank is heated to 100 degrees or 140 degrees it will stay there all the time.2. QUESTION:How long is the user willing to wait for "heat up" to occur?ANSWER:There is no set time, the temperature just needs to stay at the required settings once itreaches either 100 degrees for one tank and 140 degrees for the other tank.3. QUESTION:Indicate the pressure that the hot water system will be operating at?ANSWER:125 psi4. QuestionIs there one wind tunnel heat exchanger or two?ANSWER:One, in the water tank.5. QUESTION:What can we expect the return water temperature to be from the exchanger/s at each flowrate? We need to know the flow rate and temperatures of both sides of the wind tunnelheat exchangers.ANSWER:We only measure the temperature of the tank. There are 2 pumps attached to the tank;their flow rates are given in the original specifications.6. QUESTION:Is there a preference on the tank material; 316SS or 304SS?ANSWER:304SS is fine.7. QUESTION:It is understood that tanks will be field insulated by others; therefore, are we requiredto provide insulation clips on the tanks?ANSWER:No.8. QUESTION:What voltage do you require for the automatic water level controls? ANSWER:If it's output is from a sensor, 0 to 10 volts. If it's controlled then 24 volts.9. QUESTION:What is your time frame requirement for delivery?ANSWER:As soon as possible without rush order charges10. QUESTION:Are there size limitations on tank diameter and height?ANSWER:The current tank is approximately 60" wide x 160" tall. We really don't want anythingmuch larger if possible but this could be discussed based on what is available.The due date for quotes has been extended to 7/25/2008 3:30 p.m. CST. Address quote toJanet Appleton/PS22.Please provide quote via your companies standard submission procedures.Documents related to this procurement will be available over the Internet. Thesedocuments will reside on a World Wide Web (WWW) server, which may be accessed using a WWWbrowser application. The Internet site, or URL, for the NASA/MSFC Business Opportunitieshome page is http://prod.nais.nasa.gov/cgi-bin/eps/bizops.cgi?gr=D&pin=62 Offerors are responsible for monitoring this site for the release of the solicitation andany amendments. Potential offerors are responsible for downloading their own copy ofthe solicitation and amendments (if any).
 
Web Link
FedBizOpps Complete View
(https://www.fbo.gov/?s=opportunity&mode=form&id=e54266c97eec47ab50fa4c0031fa108b&tab=core&_cview=1)
 
Record
SN01618884-W 20080723/080721222617-e54266c97eec47ab50fa4c0031fa108b (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.