Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF JULY 26, 2008 FBO #2434
SOLICITATION NOTICE

J -- Big Cliff Dam Spillway Stoplog Repair

Notice Date
7/24/2008
 
Notice Type
Presolicitation
 
NAICS
332312 — Fabricated Structural Metal Manufacturing
 
Contracting Office
Department of the Army, U.S. Army Corps of Engineers, U.S. Army Engineer District, Portland, Portland District, US Army Corps of Engineers, Contracting Division (CENWP-CT_, P.O. Box 2946, Portland, OR 97208-2946
 
ZIP Code
97208-2946
 
Solicitation Number
W9127N08Q0095
 
Response Due
8/20/2008
 
Archive Date
10/19/2008
 
Point of Contact
Carol A. Williams, 503-808-4634
 
Small Business Set-Aside
N/A
 
Description
The US Army Corps of Engineers, Portland District, intends to award a contract for the repair of the six spillway stoplogs at Big Cliff Dam located on the North Santiam River. The contract work will include picking up the stoplogs from Big Cliff Dam using all Contractor furnished equipment, performing all necessary repair work as stated in the contract off site, and then delivering all the stoplogs back to Big Cliff Dam. The Fabrication shop performing the work must be Major Steel Bridge Certified with a Fracture Critical Endorsement to perform all weld repairs. All welding performed on the stoplogs shall meet AWS D1.5 requirements. The repair work will consist of removing all of the flange connector plates, portions of the tension flanges, and also portions of the vertical diaphragms as shown on the Contract Drawings. Once removal of the required flange pieces is complete, new flange plates shall be welded back into place using full penetration welds as detailed on the Contract Drawings. After flange repairs are completed, all full penetration splices shall be 100 % visually and ultrasonically tested. New flange connector plates shall be welded back onto the vertical diaphragms as detailed on the Contract Drawings. Once all weld repairs have been completed, the stoplogs shall be repainted in all locations that the paint has been removed. All seals, seal bolts, and associated hardware shall be replaced. The existing chain and cable lifting beam rigging shall be replaced with new cable rigging.
 
Web Link
FedBizOpps Complete View
(https://www.fbo.gov/?s=opportunity&mode=form&id=d7576fde3acccc153e0583bc162c1de3&tab=core&_cview=1)
 
Place of Performance
Address: Portland District, US Army Corps of Engineers Contracting Division (CENWP-CT-S), ATTN: Mark Heiller P.O. Box 2946 Portland OR
Zip Code: 97208-2946
 
Record
SN01622209-W 20080726/080724222439-d7576fde3acccc153e0583bc162c1de3 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.