Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF JULY 27, 2008 FBO #2435
SOLICITATION NOTICE

99 -- Instrument Landing System (ILS) Sustainment Project Runway 19L (DYH) Kansas City International Airport (MCI) Kansas City, MO

Notice Date
7/25/2008
 
Notice Type
Presolicitation
 
Contracting Office
Department of Transportation, Federal Aviation Administration (FAA), Central Region, FEDERAL AVIATION ADMINISTRATION, ASW-052 ACE - Central
 
ZIP Code
00000
 
Solicitation Number
DTFACE-09-R-29011
 
Response Due
8/25/2008
 
Archive Date
9/9/2008
 
Point of Contact
Hope Collier, 816-329-3107
 
Small Business Set-Aside
N/A
 
Description
THIS CONSTRUCTION PROJECT IS TO START & TO BE COMPLETED IN THE WINTER MONTHS AND/OR WINTER WEATHER CONDITIONS. THE CONTRACTOR SHALL BID, PREPARE & PERFORM AS REQUIRED TO MEET THE START & COMPLETION DATES OF THIS CONTRUCTION PROJECT. The scope of work for this project generally consists of, but is not limited to the following: 1. Disassemble & remove (w/o incurring damage) the existing Localizer Antenna Array, existing Glide Slope Tower & Antennas, existing Outer Marker Tower & Antennas, & all associated equipment not required to remain. 2. Salvage & hand-over the removed existing equipment, if any, per the COTR's discretion & directions to the local FAA personnel. The contractor shall load, transport, & unload such equipment, if any, to a site on the airport property per the COTR's directions. 3. Furnish competent surveying resources to properly layout the associated sites & provide horizontal & vertical control. 4. Place any excess fill material on-site or haul off of the airport property per the COTR's directions. 5. Localizer facility work; a) Prepare the existing Localizer Antenna Array foundation for the addition of the new footing sections & install new concrete foundation pads & piers. b) Grade & perform all earthwork at the Localizer Antenna Array plot & the access road. c) Provide trench & backfill same after completion of work, between the existing Localizer Shelter & the new Localizer Antenna Array. d) Install conduits, cabling, wiring, grounding, etc. in Localizer trenches as indicated & required. e) Install new Localizer Antenna Array elements, associated equipment, & cabling. f) Install EES, grounding wires, ground rods, & exothermic welds as indicated & required. g) Install all grounding equipment, bulkheads, grounding wires, bushings, etc. as required. h) Install drainage conduits in existing localizer handholes. i) Install Localizer ground-check-points. 6. Glide Slope facility work; a)Install new Glide Slope Tower. b) Install new Glide Slope Antennas. c)Install new boxes, equipment, conduit, cabling & wiring as indicated & required. d)Install all grounding equipment, bulkheads,grounding wires, bushings, etc. as required. 7. Outer Marker facility work; a)innstall antenna tower. b) Install new boxes, equipment, conduit, cabling & wiring as indicated & required. c) Install all grounding equipment, bulkheads, grounding wires, bushings, et. as required. d) Install aggregate surfacing over weed barrier on the separate plot areas per drawings. 8. Excavate, trench, & install electrical cables/conduits & backfill for all facilities. 9. Install the Government Furnished Materials (GFM) 10. Furnish & install all electrical hardware, conduits, wiring, power sources, equipment, underground cables, enclosures, & junction boxes as required. 11. Furnish & install all above grade & below grade grounding conductors, ground rods, exothermic weld, & all other associated grounding requirements. 12. Restore grade at all disturbed & effected areas due to the activities & construction work associated with this entire project. Seed and/or resurface all areas modified or damaged during project construction. 13. Accomplish other incidental duties to accommodate site peculiar conditions. 14. Furnish & install aggregate surfacing over weed barrier at any new and/or existing plots, roads, & any other disturbed areas due to the contruction activities. 15. Furnish & install all items on the construction drawings, specifications, change orders & other change documents not specified in items 1 through 12 listed in this section. 16. Implement & maintain a quality control plan to ensure contract compliance. Conduct all required tests & checks to verify contract compliance. Contract Time- 45 days THIS IS A SMALL BUSINESS SET-ASIDE. ESTIMATED PRICE RANGE $100,000 - $200,000 NAICS: 237990 BUSINESS SIZE STANDARD: $31,000,000 *To be placed on the mailing list, pleas submit a request in writing via email to Hope.CTR.Collier@faa.gov or fax to (816)329-3137. The request must include solicitation number, company name, point of contact, address, phone & fax numbers. **This notice is for information purposes for Minority, Women-Owned and Disadvataged Business Enterprises: The Department of Transportation (DOT), Office of Small and Disadvataged Business Utilization, has a program to assist small businesses owned and controlled by a socially and economically disadvantaged individuals, and women-owned concerns to acquire short-term working capital assistance for transportation-related contracts. Loans are available under the DOT Short Term Lending Program (STLP) at prime interest rates to provide accounts receivable financing. The maximum line of credit is $750,000. For further information and applicable forms concerning the STLP, call the OSDBU at 1-800-532-1169.
 
Web Link
FedBizOpps Complete View
(https://www.fbo.gov/?s=opportunity&mode=form&id=8e69556ef2cd070dd93820c59632d60a&tab=core&_cview=1)
 
Record
SN01624032-W 20080727/080725225504-8e69556ef2cd070dd93820c59632d60a (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.