Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF AUGUST 16, 2008 FBO #2455
SOLICITATION NOTICE

66 -- Oxide Molecular Beam Epitaxy System

Notice Date
8/14/2008
 
Notice Type
Modification/Amendment
 
NAICS
334516 — Analytical Laboratory Instrument Manufacturing
 
Contracting Office
Department of the Navy, Office of Naval Research, Naval Research Laboratory, 4555 Overlook Ave. S.W., Washington, District of Columbia, 20375
 
ZIP Code
20375
 
Solicitation Number
N00173-08-R-KK06
 
Response Due
8/21/2008 4:00:00 AM
 
Archive Date
7/31/2009
 
Point of Contact
Kevin M King, Phone: 202-767-1495, F. Janilea Bays,, Phone: 202-767-2974
 
E-Mail Address
kevin.king@nrl.navy.mil, jan.bays@nrl.navy.mil
 
Small Business Set-Aside
N/A
 
Description
The purpose of this modification is to indicate that an incorrect version of the specifications was posted to NRL’s website and to answer questions from a prospective offeror. A corrected version of the specifications is now available. The link is repeated below for convenience: http://heron.nrl.navy.mil/contracts/RFP/08kk06.htm The questions and answers are as follows: 1. We would like to get some more information on the design and dimensions of the chamber to which the new chamber needs to be connected. Can you provide a dimensional drawing of the existing V80 MBE machine? Drawings will posted to NRL’s website on Monday, August 18, 2008. 2. If drawings are not available, we need to know the following information: a.What is the size of the flange (of the preparation chamber) that will be used for attaching the new chamber? The flange at the end of the preparation chamber is an 8” OD Conflat flange. b.What is the diameter of the sample chamber? The diameter of the preparation chamber is 12” c.What is the sample loading position inside the preparation chamber (height from the laboratory floor assuming that the loading position is at the center of the chamber)? The sample loading position is offset horizontally from the center of the preparation chamber. The sample platen passes through the approximate center of the 8” flange. The platen is approximately 46.75” ( ±0.5") above the floor at the loading position. d.What is the amount of space available around the preparation chamber to attach the new chamber? The existing VG80H bench runs parallel to the prep chamber on one side. Its nearest approach to the center of the 8" flange is 21" horizontally and 12" vertically (below) from the center of the 8" flange. The bench extends 8" beyond the flange. An existing wall is 51" from the flange and perpendicular to the axis of the prep chamber. These measurements are believed to be accurate to within ±0.5" (estimated). However, this is not expected to be a constraint, since NRL’s laboratory will most likely need to be re-arranged in any event. e.Can you provide a drawing of the V80 wafer carrier? A drawing of the VG80H wafer carrier will be posted to NRL’s website on Monday, August 18, 2008. The wafer is carried horizontally (epi face down) on a trolley system. Transfer to and from the trolley is accomplished with wobble sticks. 3. Can you grant an extension to the due date until August 25, 2008? No. The solicitation will be extended until 4:00 pm. on Thursday, August 21, 2008.
 
Web Link
FedBizOpps Complete View
(https://www.fbo.gov/?s=opportunity&mode=form&id=565f26c7586402247a248c301b8526ac&tab=core&_cview=1)
 
Place of Performance
Address: Naval Research Laboratory, 4555 Overlook Ave., Washington, District of Columbia, 20375-5326, United States
Zip Code: 20375-5326
 
Record
SN01641055-W 20080816/080814224625-565f26c7586402247a248c301b8526ac (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.