Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF AUGUST 17, 2008 FBO #2456
DOCUMENT

B -- Hazardous Waste Management Plan (HWMP) - Solicitation

Notice Date
8/15/2008
 
Notice Type
Solicitation
 
NAICS
562998 — All Other Miscellaneous Waste Management Services
 
Contracting Office
Department of the Army, National Guard Bureau, 103 FW/LGC, BRADLEY ANG BASE, 100 NICHOLSON ROAD, EAST GRANBY, Connecticut, 06026-9309
 
ZIP Code
06026-9309
 
Solicitation Number
W91ZRS-08-T-0012
 
Archive Date
9/13/2008
 
Point of Contact
Dawn.Whelan,, , Piper L. Masse,, Phone: 8602922320
 
E-Mail Address
dawn.whelan@ctbrad.ang.af.mil, piper.masse@ctbrad.ang.af.mil
 
Small Business Set-Aside
Total Small Business
 
Description
STATEMENT OF WORK FOR UPDATE ANG FACILITY HAZARDOUS WASTE MANAGEMENT PLAN June 2008 1.0 INTRODUCTION The purpose of this Statement of Work (SOW) is to outline the tasks required to review, modify, and update the ANG Facility Hazardous Waste Management Plan (HWMP). 1.2 BACKGROUND The ANG facility maintains a HWMP that reflects hazardous wastes (HW) generated on the base. The plan has been updated to accurately reflect waste streams generated, locations of waste generation and base personnel responsible for compliance with hazardous waste regulations. The ANG Facility has undergone recent changes regarding operations and tenants along with extensive new building construction and old building demolition. The HWMP requires a major revision to reflect the new locations of HW generation, updated facility maps and inclusion of new regulatory information. 2.0 SCOPE OF WORK Under the provisions of this SOW the contractor shall accomplish the following: 2.1 PERFORM SITE SURVEY The contractor shall provide personnel knowledgeable in Federal hazardous waste regulations to perform a site survey of the facility. The site survey shall include a review of the current HWMP, tour of the entire base to include all industrial shops and locations of hazardous waste generation, verification of HW streams listed in the current HWMP, identification of new HW streams and verification of personnel listed in the HWMP. The site survey shall be coordinated in advance with the EM. For security reasons, the contractor shall provide names and social security numbers of all personnel participating in the site survey. This information must be provided a minimum of one week prior to the site survey. 2.2 DRAFT HAZARDOUS WASTE MANAGEMENT PLAN The contractor shall incorporate all information gathered during the site visit into a revised Draft HWMP. The plan shall be reduced in size from the current plan if applicable. The draft plan shall meet Federal requirements listed in 40 Code of Federal Regulations (CFR) and state requirements. The format of the current HWMP may be used or revised to a different format, provided it meets Air National Guard requirements. The Draft HWMP shall include the following at a minimum:  Updated facility maps that accurately reflect recent building construction/demolition  Updated list of waste streams  Shop name, location  Proper shipping name, hazard class, packing group and label codes from 49 CFR 172.101 for each identified waste stream (when possible)  Updated waste stream identification numbering system that reflects the current locations of shops on the base  Updated list of personnel with hazardous waste duties  Updated references to hazardous waste regulations (federal and state)  Updated HW analysis plan  Updated HW training section  Updated guidance on record keeping and reporting  Hazardous waste contingency procedures  Emergency response procedures  Outline of Universal Waste regulations  Management of medical wastes  Other information required by the Air National Guard  Other information deemed pertinent by the contractor The contractor shall provide two copies of the Draft HWMP within twelve weeks of the site survey for review. One hard copy and one electronic copy on CD shall be provided to the EM. 2.3 FINAL HAZARDOUS WASTE MANAGEMENT PLAN Within one month of receipt of EM comments on the Draft-Final HWMP, the contractor shall provide three electronic copies of the Final HWMP on CD and one hard copy of the Plan for the EM, and 1 electronic copy for ANG/A7CV. 3.0 DELIVERABLES 3.1 DELIVERABLE ONE Deliverable One consists of travel, lodging and days on base to perform the Site Survey. Deliverable One will occur within a time interval deemed suitable by the Facility EMO and the contractor. 3.2 DELIVERABLE TWO Deliverable Two consists of publication of the Draft Hazardous Waste Management Plan. Deliverable Two will occur within twelve weeks of conclusion of the Site Survey. 3.3 DELIVERABLE THREE Deliverable Three consists of publication of the Final Hazardous Waste Management Plan. (One hard copy and 4 electronic copies). Deliverable Three will occur within four weeks of receipt of EM comments on the Draft HWMP. 4.0 PERIOD OF PERFORMANCE The period of performance will be one year from the date of award. Partial billing, based on deliverables, is authorized.
 
Web Link
FedBizOpps Complete View
(https://www.fbo.gov/?s=opportunity&mode=form&id=e2b4315e295718201054a2571e62cdf4&tab=core&_cview=1)
 
Document(s)
Solicitation
 
File Name: Solicitation (HWMP Solicitation.doc)
Link: https://www.fbo.gov//utils/view?id=837a707f30f59f57a5630ed002f1fe78
Bytes: 55.00 Kb
 
Note: If links are broken, refer to Point of Contact above or contact the FBO Help Desk at 877-472-3779.
 
Place of Performance
Address: 103 Airlift Wing, Connecticut Air National Guard, 100 Nicholson Road, East Granby, Connecticut, 06026-9309, United States
Zip Code: 06026-9309
 
Record
SN01641349-W 20080817/080815223004-e2b4315e295718201054a2571e62cdf4 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.