SOLICITATION NOTICE
72 -- Sauna Replacement
- Notice Date
- 8/27/2008
- Notice Type
- Modification/Amendment
- NAICS
- 321992
— Prefabricated Wood Building Manufacturing
- Contracting Office
- Department of the Air Force, Air Mobility Command, 60th CONS, 350 Hangar Ave. Bldg 549, Travis AFB, California, 94535-2632, United States
- ZIP Code
- 94535-2632
- Solicitation Number
- F3Z3688192A001SAUNA
- Response Due
- 8/29/2008 3:00:00 PM
- Archive Date
- 9/13/2008
- Point of Contact
- Jose A Hernandez,, Phone: 707-424-7770, Josephine G Cobb,, Phone: (707) 424-7720
- E-Mail Address
-
jose.hernandez-02@travis.af.mil, josephine.cobb@travis.af.mil
- Small Business Set-Aside
- Total Small Business
- Description
- The purpose of this Amendment is to post question and answers that arouse for this project 1) Please confirm these finished interior dimensions; 7'-8" X 13'-10" X 7'-2" 2) We are planning to provide a 3'-0" door 3) We have seized the appropriate heater for sauna -- however what is the 'current' volts, #-phase & AMP Electrical service available and is it anticipated to remain as the same source/ spec unchanged for the new heater unless manufacturer requires different volts, #-phase & Amp service? 4) We have arranged for (assuming if/when appropriation and award) standby potential FOB shipping of all custom components involved to the Travis AFB -- However it will require two-men at site to unload materials and set nearby point of replacement. Shall we coordinate this 'unloading' with your personnel or we shall plan to meet the carrier on/with our own personnel, no problem. <--- The latter would be most efficient provided we could also begin our work the same day (or day after) as well then. Just a thought to keep in mind for implementation procedures. 5)Please define the following: Is the existing sub/wall framing (sub-structure) metal studs?...Wood? and if so wood, 2x4 or 2x6? (perhaps just measure the door jamb width please) This will also help us to determine if there is a layer of plywood backing or gypsum in place. --->OR Are we to remove completely the old framing, insulation, wiring...etc and rebuild/replace all new framing and related materials to accommodate a newly sized/configured Sauna? This is what the end user sent 1. Yes, those are the correct dimensions. 2. Currently we have 3'0' existing door. 3. Currently in use: controller 120/208-240, 3 wire, 40 AMP 30 60 cycle in use 4. We can provide Fitness personnel to assist in unloading. 5. Wood 2X4.
- Web Link
-
FedBizOpps Complete View
(https://www.fbo.gov/?s=opportunity&mode=form&id=2760566a03742efcd38585ef27fc164e&tab=core&_cview=1)
- Place of Performance
- Address: Travis AFB, Travis AFB, California, 94585, United States
- Zip Code: 94585
- Zip Code: 94585
- Record
- SN01653097-W 20080829/080827222059-2760566a03742efcd38585ef27fc164e (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |