Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF OCTOBER 22, 2008 FBO #2522
SOLICITATION NOTICE

99 -- Cab Console Reconfiguration, Midway Air Traffic Control Tower, Chicago-Midway Airport

Notice Date
10/20/2008
 
Notice Type
Presolicitation
 
Contracting Office
Department of Transportation, Federal Aviation Administration (FAA), Great Lakes Region, FEDERAL AVIATION ADMINISTRATION, FAA AGL - Great Lakes
 
ZIP Code
00000
 
Solicitation Number
7264
 
Response Due
10/27/2008
 
Archive Date
11/11/2008
 
Point of Contact
Melody McGovern, (847) 294-7347<br />
 
Small Business Set-Aside
N/A
 
Description
The FAA, Great Lakes Region, intends to enter into a single source procurement with Evans Consoles to design and install a new console system for the Midway ATCT. The existing consoles need to be reduced in depth, height and reconfigured to provide for new electronics equipment. The FAA will work with the vendor to come up with a console design that will allow for CPU storage under the console including a slide out drawer to include cable management, allow for power conduits and grounding (by the FAA) and cab layout. It is the FAA's intent to utilize the same concept from the O'Hare modernization project for the perimeter consoles and slatwall system. Services under this contract will include development, coordination, planning, engineering, determination of compatibility with the current cab structure design, compatibility with the proposed electronics equipment, consideration of human factor criteria, prototype evaluation, cost estimating and installation. The firm will be required to work in occupied space during low traffic hours of operation. Any interruption to Air Traffic operation will cause economic hardship for the airlines and a major inconvenience to the flying public. The FAA cannot tolerate any unnecessary risk/accidental outage at this Airport. The timing of this project must align with an ongoing electronics equipment replacement project at Midway. The console replacement project will occur in a live, operational environment, and must be completed in four months or less. Targeted completion date is currently August 2009. Should a vendor believe they are capable of providing this requirement contact the Contracting Officer, Melody McGovern at 847/294-7347.
 
Web Link
FedBizOpps Complete View
(https://www.fbo.gov/?s=opportunity&mode=form&id=f358a49b74bdbe57308a9b9fdd4c37b0&tab=core&_cview=1)
 
Record
SN01693663-W 20081022/081020214409-f358a49b74bdbe57308a9b9fdd4c37b0 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.