SOLICITATION NOTICE
Y -- AZ PFH 3-1(1), Flagstaff-Clint's Well Road (Lake Mary Road)
- Notice Date
- 11/4/2008
- Notice Type
- Modification/Amendment
- NAICS
- 237310
— Highway, Street, and Bridge Construction
- Contracting Office
- Department of Transportation, Federal Highway Administration (FHWA), Central Federal Lands Highway Division, 12300 West Dakota Avenue, Lakewood, Colorado, 80228
- ZIP Code
- 80228
- Solicitation Number
- DTFH68-09-B-00001
- Archive Date
- 2/19/2009
- Point of Contact
- Tiffany C Atchison,, Phone: 720-963-3354, Brenda J McGehee,, Phone: 720-963-3353
- E-Mail Address
-
tiffany.atchison@fhwa.dot.gov, brenda.mcgehee@fhwa.dot.gov
- Small Business Set-Aside
- N/A
- Description
- BASED ON RESPONSES RECEIVED, THIS PROJECT WILL BE ADVERTISED ON A FULL AND OPEN BASIS. PROJECT DETAILS: This project will consists of three schedules for road reconstruction, grading, drainage, asphalt surfacing and guardrail replacement on 12.946 miles (longest schedule) of roadway on project AZPFH 3-1(1), Flagstaff-Clint’s Well Road in Coconino National Forest, Coconino County, Arizona. The estimated price range is $12 million to $15 million for the longest schedule. Principal work items on the longest schedule include: lump sum contractor testing; lump sum construction schedule; lump sum miscellaneous survey and staking; 26,200 LNFT of silt fence for soil erosion control; 230 each of check dams for soil erosion control; 7,500 MGAL of watering for dust control; 43.0 ACRE of clearing and grubbing; lump sum removal of structures and obstructions; 110,000 CUYD of embankment construction; 1,220 CUYD of placed riprap, various class; 23,700 tons of aggregate base; 68,300 SQYD of pulverizing, 8-inch depth; 27,500 tons of superpave pavement; 2,200 tons of hot asphalt concrete pavement; 114 tons of prime coat grade; 180 CUYD of concrete; 1,543 LNFT for various pipe culverts; 421 LNFT of precast reinforced concrete box culverts (various span); 7,160 LNFT of concrete curb; 1,150 LNFT of ductile iron 12-inch waterline; 16,475 LNFT of guardrail system G4, type 4, class A wood postss; 19,375 of placing conserved topsoil; 13,500 hours of traffic control (flagger and pilot car); 95 weeks of traffic and safety supervisor; along with various elements of traffic control. Tentative advertisement date is November 19, 2008. PLEASE NOTE: The Invitation for Bid will be available for download after November 19, from the Federal Business Opportunities (FBO) website at www.fedbizopps.gov. PLANS WILL BE AVAILABLE FOR DOWNLOAD IN ADOBE (.pdf) FORMAT ONLY ON CFLHD's WEBSITE at http://www.cflhd.gov/procurement/construction/advertised-projects.cfm under the Project Name. Other information regarding this solicitation is also available at the above website. If you have problems accessing information on the website, please call (720) 963-3353 or (720) 963-3354. Technical questions specific to the project will only be addressed by FHWA via written correspondence to e-mail address CFLContracts@fhwa.dot.gov or FAX to (720) 963-3360.
- Web Link
-
FedBizOpps Complete View
(https://www.fbo.gov/?s=opportunity&mode=form&id=099a454556d39cc0fe1ffb85b9f86b83&tab=core&_cview=1)
- Place of Performance
- Address: Coconino National Forest, 1824 S. Thompson St, Flagstaff, Arizona, 86001, United States
- Zip Code: 86001
- Zip Code: 86001
- Record
- SN01700414-W 20081106/081104214831-099a454556d39cc0fe1ffb85b9f86b83 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |