Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF DECEMBER 13, 2008 FBO #2574
DOCUMENT

Y -- RUBY CREEK CULVERT REPLACEMENT - Amendment 2

Notice Date
12/11/2008
 
Notice Type
Amendment 2
 
NAICS
237110 — Water and Sewer Line and Related Structures Construction
 
Contracting Office
Department of Agriculture, Forest Service, R-6 Eastern Washington ZAP, Colville NF, 765 S. Main, Colville, Washington, 99114
 
ZIP Code
99114
 
Solicitation Number
AG-05G1-09-S-9001
 
Response Due
12/12/2008 4:00:00 PM
 
Archive Date
12/19/2008
 
Point of Contact
Kris D Bellini,, Phone: 509-684-7113, Bruce Bailey,, Phone: 5096847220
 
E-Mail Address
kbellini@fs.fed.us, babailey@fs.fed.us
 
Small Business Set-Aside
Total HUB-Zone
 
Description
The purpose of this amendment is to cancel Solicitation Number AG-05G1-S-09-9001. The project is re-advertised under AG-05G1-S-09-9004 with new or revised associated plans and specifications. Place that solicitation number in the search box or click on the following link at Fedbizopps: https://www.fbo.gov/index?s=opportunity&mode=form&id=fac35b98603f64cc9a275a5f484ff1eb&tab=core&_cview=0 In the new solicitation there will be changes to the plans and specifications. The new set of specs that describes the spec changes to the following sections: 204 – Excavation and Embankment, 648 – Stream Simulation. The change in the Specification List includes section 625 – Turf Establishment as being applicable. Changes to the Schedule of Items. The new Schedule of Items reflects 1. changes in the culvert metal thickness and 2. Changes in the quantities and pay items. Change in the Plans. The new set of plans reflects the following changes: 1. Increase in culvert metal thickness, 2. More detailed breakout of borrow material needed to construct the bypass road and the Ruby Creek Road, 3. Changes to the 12 foot diameter culvert installation to increase the depth of streambed material through the culvert, 4. Changes in the streambed material and gravel running surface source for the project, and 5. Changes in the estimate of quantities and items. Contractors are encouraged to conduct site investigations prior to seasonal shutdown of the area. For additional information contact Bruce Bailey, Engineer, 509-684-7220. e-mail: bbailey@fs.fed.us. The contractor’s proposal from the new solicitation AG-05G1-S-09-9004 will be due JANUARY 30, 2009, at 4:00 PM local time. To be delivered to USDA Forest Service, Attn: Kris Bellini, 765 South Main St, Colville, WA 99114.
 
Web Link
FedBizOpps Complete View
(https://www.fbo.gov/?s=opportunity&mode=form&id=168db1f517461e40daf32e50b8403cd9&tab=core&_cview=1)
 
Document(s)
Amendment 2
 
File Name: Amendment 002, cancellation of solicitation AG-05G1-S-09-9004, see amendment for revised solicitation (amendment_2.doc)
Link: https://www.fbo.gov//utils/view?id=17fbe069f2ce6c11b89613c42b6176af
Bytes: 63.00 Kb
 
Note: If links are broken, refer to Point of Contact above or contact the FBO Help Desk at 877-472-3779.
 
Place of Performance
Address: Pend Oreille County, Newport Ranger District, Washington, United States
 
Record
SN01717567-W 20081213/081211220254-168db1f517461e40daf32e50b8403cd9 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.